Author

Topic: [ANN] New Brunswick Canada Professional Miner Hosting Service (100 MW available) (Read 431 times)

newbie
Activity: 8
Merit: 0
Is there still space left at your facility?
legendary
Activity: 3080
Merit: 1080
Hi,

Any space left at your facility?

Is the minimum KW consumption set in stone or flexible?

Thanks

Yes, we have 10 MW coming up for newer gen gear such as S17/T17. As for minimum consumption it's not set in stone, but we are trying to go for the big fish and we'd prefer a decent size chunk of hardware. Let me know via PM how much capacity you're interested in hosting.

Cheers!
full member
Activity: 392
Merit: 159
Hi,

Any space left at your facility?

Is the minimum KW consumption set in stone or flexible?

Thanks
legendary
Activity: 3080
Merit: 1080
Update: Minimum consumption still remain 1 MW and price remains the same, but capacity is getting smaller so if you're interested now would be the time to contact us.
legendary
Activity: 3080
Merit: 1080
Please see our latest price structure below:

1,000 kW or more - $41 USD (55 CAD) per kW per month All Inclusive (based on Antminer S9 or similar), $26 USD (35 CAD) installation per miner (Antminer S9 or similar)

**15 Megawatts immediately available**
legendary
Activity: 3080
Merit: 1080
Thanksgiving special @ 55CAD per kW per month.

Miner deployment of at least 1.5MW for a minimum three year contract and three month deposit, with NO prepayment (billed at the end of a month) **************55CAD per kW ($41.5USD per kW or $0.057USD per kWh)
legendary
Activity: 3080
Merit: 1080
Ottawa?? really??
Can I  work there PLEASE!!!
Can I host my machines there too!!!

Probably to #1 and most certainly to #2  Cheesy PM me your e-mail address and name and I will get you in touch with the right people to get the ball rolling.

sr. member
Activity: 558
Merit: 295
Walter Russell's Cosmogony is RIGHT!
Ottawa?? really??
Can I  work there PLEASE!!!
Can I host my machines there too!!!
legendary
Activity: 3080
Merit: 1080
New pricing structure as of Oct 29 2018:

50kW to 500kW – 90 CAD per kW per month (all inclusive, based on Antminer S9 or similar), 85 CAD installation per miner (Antminer S9 or similar), 3 months full deposit, 1 year minimum

500kW to 1000kW – 85 CAD per kW per month (all inclusive, based on Antminer S9 or similar), 75 CAD installation per miner (Antminer S9 or similar), 3 months full deposit, 1 year minimum agreement

1000 kW to 5000 kW – 76 CAD per kW per month (all inclusive, based on Antminer S9 or similar), 50 CAD installation per miner (Antminer S9 or similar), 3 months full deposit, 1 year minimum agreement

5000 kW to 10000 kW – 72 CAD per kW per month (all inclusive, based on Antminer S9 or similar), 50 CAD installation per miner (Antminer S9 or similar), 3 months full deposit, 1 year agreement

10 MW to 50 MW – 70 CAD per kW per month (all inclusive, based on Antminer S9 or similar), 50 CAD installation per miner (Antminer S9 or similar), 3 months full deposit, 1 year agreement

50 MW to 150 MW – 65 CAD per kW per month (all inclusive, based on Antminer S9 or similar), 50 CAD installation per miner (Antminer S9 or similar), 3 months full deposit, 1 year agreement
legendary
Activity: 3080
Merit: 1080
Half a Megawatt available immediately within Moncton site
4 Megawatts available in 60 days if a customer places order on us today.
100 Megawatts available = 12-14 months in Moncton (can be accelerated)
150 Megawatt within 6-8 months available within Ottawa (can be accelerated)
legendary
Activity: 3080
Merit: 1080
New Price List and Terms:

We are constantly investing and exploring green energy sources and technology and as a result was able to bring their service prices down to better serve the blockchain community.

- Over 1MW orders - 70 CAD per kW per month based on Antminer S9 or similar
  Installation 50 CAD per miner (S9)

- Between 500kW-1MW orders - 95 CAD per kW per month based on Antminer S9 or similar
  Installation 75 CAD per miner (S9)

- Under 500kW orders - 105 CAD per kW per month based on Antminer S9 or similar
  Installation 85 CAD per miner (S9)

- Three month deposit
legendary
Activity: 3080
Merit: 1080
Hello fellow miners. Looking to get into crypto mining in a big way? Check this out:

100 MW of available power located in the Canadian province of New Brunswick. Half a Megawatt (500KW) available immediately.  4 Megawatts available in 60 days if a customer places order today. 40 Megawatts in 8 months. 100 Megawatts available = 12-14 months.

Data center description:

- 25,000 sq ft
- Multiple National and Global Tier I-III Network Providers
- UPS and Generator back-up power for critical network infrastructure
- 24x7x365 Escorted Access
- 24x7x365 Smart Hands Services
- Reliable power grid with redundant feeder lines
- 250V AC on Raritan switched PDUs (thus remote power cycle is possible)
- Air cooling capable of handling the peak summer temperatures
- 6 Layers of physical security
- 24x7x365 monitored facilities with full perimeter video surveillance
- High security procedures access
- VPN access to your miners
- Miner automatic reboot script available
- High uptime data center design

Pricing structure:

1,000 kW or more - $41 USD (55 CAD) per kW per month All Inclusive (based on Antminer S9 or similar), $26 USD (35 CAD) installation per miner (Antminer S9 or similar)


We prefer compact ASIC miners but we may accept GPU miners as well if they are power dense and space efficient. At the moment though we are targetting customer who have
ASIC miners from the likes of Bitmain, Canaan, Innosilicon, etc.

Customer must supply a PSU for each miner! (We recommend Bitmain PSUs)

Data center tours available upon request.

If you are interested or know someone who is get in touch with me either here or you can hit me up on Telegram via this link:

https://t.me/btc_guru

I prefer telegram so I ask you a few question about your requirements and plans for expansion.

Happy mining!



Jump to: