sick looking redesign.  i like the slots Smiley  

we can see the module or heatsink is different as batch 2 did not have power and IDE like connections on the top like that.

also the heatsinks face each other so a tunnel of air will blow between them.  cool idea.

however, i also noticed that the modules look much closer together and also closer to the case edges.  this leaves 2 options i can think of...

smaller footprint unit?  it might mess up stacking though

longer modules?  hmm, better option. or maybe longer heatsinks

the tightly cropped picture adds to my suspicion

are my eyes playing tricks??
full member
Activity: 182
Merit: 100
1Kgyk4nQSzb3Pm9E9vWiGVyJ6jpPwripKf
can't wait to get my 85ghs miners!
newbie
Activity: 30
Merit: 0
Interestingly what will be the cost of the new 55nm chips?
sr. member
Activity: 448
Merit: 250
If they can improved the thermal design to make the fan noise to a acceptable level, it will be perfect for me.
legendary
Activity: 3080
Merit: 1080
Oh boy, get ready for a MASSIVE increase in difficulty. FPGA and GPU miners will be surely forced to shutdown now.
hero member
Activity: 742
Merit: 500
Nice, I can't wait until the chips start shipping in bulk so the ASIC mining hardware shortage will end, and sellers will have no choice but to lower their prices and stop gouging.
full member
Activity: 204
Merit: 100
where did you get that photo from?

It is in newsletter
hero member
Activity: 525
Merit: 500
..yeah
where did you get that photo from?
hero member
Activity: 532
Merit: 500
Latest Newsletter:


Avalon ASIC July Update, Trade-In, Batch #3, Chips and more

What's an update without some photos?



Batch three Refund

Understandably, batch three has been overdue for a few weeks, whilst shipping is due to start Monday, and finish within 2 weeks. Those who do not wish to wait can fill out the form for a refund, please note the deadline for these refunds is before the 14th, once we start shipping we will not be honoring any refunds that gets posted.


Finally caught up

Scaling up production has been problematic for us in the past, but today? No more. The speed which we finished shipping batch #2 which took about 3 weeks (aside from custom issues with Serbia and Germany), batch #3 will be no different, and will be even faster. We modified the module upgrade design so it'll fit both generation 1 and generation 2 case setups, the chips are being moved to shanghai so they may begin to deliver by mid-july, trade-in list has been acquired and cleaned up. ( I hope everyone already have an account on the store. ) The Avalon team are very excited to get these things over with so we may get back to engineering.


In Summary

Trade-in emails are going out at the same time as this newsletter.

The chips is scheduled to start delivering mid-july in order which they were purchased.

Batch three starts shipping mid-july, expected to finish within 2 weeks as there is no order issues unlike batch #2

Part of batch #3 will have different design as we continue to improve our unit.

Once batch three starts shipping and no problem arises, we will begin taking orders for upgrade modules.
upgrade modules will be in-stock as there is no pre-order, delivery time frame 3-5 days.

Next generation chip is in the works, 55nm will not be very different physically for backward compatibility.

We will make announcement at least 2 month prior of 55nm release so those who purchase our generation one chip will not be in the dark.

--
Doesn't mention anything about the BTCman/Gridman/BTCgarden smacktalk or his potential 55nm chips ambition...