I created these forms a while back and posted them in the
respective threads in this sub forum but as expected, they have been buried.
Now that August is passing, maybe we can increase participation and get a sense for our position in the queue and overall orders for BitFury products.
These are the forms to enter your order details (feel free to leave out or obfuscate as much as you want):
[ You can find your data under http://www.bitfurystrikesback.com/my-account/view-order/ or https://megabigpower.com/shop/index.php?route=account/order ]If you just want to view the responses, here are the direct links to the spreadsheets:
Thanks a lot for participating and keeping up! En route to being the first major Bitcoin ASIC project to ship in time!
Most recent quotes regarding production + estimated shipping:
Update:First H-boards are off the production line! I'm very happy and excited about this! It's looking like we'll be able to ship everything in time!
http://i43.tinypic.com/24d24gh.jpg (
picture of c-scape's H-CARD v1.2)
[…]
The order for 100TH and August product is all one batch, and its being produced now. The first 4 full rigs shipped to Tytus today. I expect the rest to finish assembly very soon (though specific finish date has not been provided by factory). We have no reason to expect production delays at this point, or that we won't have enough product.
Logistically there two challenges for each effort:
For 100TH, assembling, configuring and running all those rigs will take time. We are trying to cut down on that by: preassembling racks, prewiring them with PDU, switch, patch cords, power cords & power supplies. We are pre-imaging SD cards for all the rPIs for both 100TH and customer orders. I have all the racks, PDU's, switches, PSUs, patch cords, power cords, SD cards, rPi's and a 16x SD duplicator all in hand.
For August orders the main bottleneck will be testing for bad cards. We will try to fire up as many as we can to test simultaneously. We can see fairly immediately if there is a card with bad chips, so hopefully we don't need to test for very long - maybe only a few hours, or until the unit shows it can come up to operating temperature with no bad behavior. Then out the door they should go.
I have two different ship teams and a build team for 100TH.