Author

Topic: bw.com bsixteen (Read 687 times)

legendary
Activity: 1498
Merit: 1030
February 28, 2016, 03:54:48 AM
#2
4 months or so, per their current claims on their "next gen chip".

 Given they were almost 3 months late on their "planned" deployment of the B11, I'd guess more likely 6+ months out - but they'lll probably hit pretty close to their announced numbers WHEN they start deploying it.

 Their claims for the LK1402 chip they plan to put in that B16 put it on a par more-or-less with the current Bitfury chip - NOT superior as they claim, more like equal - but final specs tend often to not match the early claims even from reasonable reputable folks.


 I suspect Bitmain will have a 14/16nm generation chip out by the time any B16 units actually go on sale.
sr. member
Activity: 471
Merit: 252
February 24, 2016, 05:51:32 AM
#1
Hi everybody,

did anyone yet look into B16?

From the website (semi auto-translated):
Quote
B16 cloud Operators force minimum purchase share of 0.01T, after the purchase of zero force 20 days after the delivery operator, after closing the transaction and the freedom to enjoy the benefits of mining, weekly earnings daily settlement payment.

Quote
Subscription delivery Operators force

Subscription successful delivery operators zero force after 20 days. B16 cloud mining machine operator to force the world's most advanced 14nm process bitcoin chip as the core, the current mainstream mining machine energy consumption by more than 35% more energy efficient and more stable and more difficult to resist and block the growth incentives halved risks, lead the world.

Quote
Revenue transparency

Users obtain PPS 97.5% rate of return in addition to the maintenance of the net outside. The remaining 2.5% of net income to compensate for mine construction, mine operation and maintenance, daily operations, mining machine maintenance. Each T operator force PPS earnings is calculated as: 10 ^ 12 × 86400 × ÷ current block reward current network of difficulty ÷ 2 ^ 32.

Quote
Long strong earnings

As low as 0.5 degrees per regular cheap electricity, power consumption is very low unit count stable mining equipment, professional operation and maintenance team, so B16 cloud Operators force has low maintenance cost-benefit ratio, revenue-generating, at the same time , extending the life cycle of the mining machine, time is more long-term profit.

Not yet sure if this cloud contract is worth considering, even with the "low" maintenance fee. Especially since the new hashnest exit strategy is still present in the form of:
Quote
10 days less than the average income deduction time-consuming maintenance, the contract temporarily stopped (non-terminating), 30 days less than the deductible income and time-consuming maintenance, the contract is terminated.

An interesting sidenote is the fact, that the same account "xd***uhm" that heavily bought B12 shares (and possibly B11 shares, too) already ordered 1000T so far.

What do you guys think?
Jump to: