Author

Topic: Cooldragon farms host miners with 0.035usd per kwh. (Read 161 times)

jr. member
Activity: 82
Merit: 1
Cooldragon
Support.
jr. member
Activity: 82
Merit: 1
Cooldragon

how does this work exactly you buy the ASIC equip in china and it is shipped there?

details? escrow? the usual Smiley

Brad



It is host service.  Escrow is ok.
copper member
Activity: 2898
Merit: 1464
Clueless!

how does this work exactly you buy the ASIC equip in china and it is shipped there?

details? escrow? the usual Smiley

Brad

jr. member
Activity: 82
Merit: 1
Cooldragon
Cooldragon Miners Hosting Service Farms Overview
-------------------------------------------------------------------------------------------------------
Hydro Power farms:
1.Stable and safe state-owned power supply;
2.Electricity price includes applicable taxes.
3.Power failure will not exceed 48 hours per month;
4.Maintenance team is stationed to guarantee uptime of 99% or higher;
5.All fiber node network. China Unicom, China Mobile and China Telecom are providing high-quality network connection;
6.Professional farm design to meet the needs of large hashrate miners;
7.Professional tech support team works at the farm with 5 years works experience.
8.Farm already in operation, machines can be setup immediately;
9.Power consumption calculated accurately.

Location:            Yunnan/Sichuan         
Price (Wet Season):      0.035usd per kwh.
Electricity Type:         Hydro Power            
Electricity Loss:         3%                  
Minimum Quantity:      40pcs
Supported Hardware:      Asic miner(big hashrate)   
Remaining Capacity:      50000pcs
Operational Start Date:   2017               
Other Costs:            None

Attention:  This is wet season price, time is from May to Nov.



---------------------------------------------------------------------------------------------------------------------
Coal Power Farms
1.Stable and safe state-owned power supply;
2.Electricity price includes applicable taxes.
3.Power failure will not exceed 48 hours per month;
4.Maintenance team is stationed to guarantee uptime of 99% or higher;
5.All fiber node network.
 6.Professional farm design to meet the needs of large hashrate miners;
7.Professional tech support team works at the farm with 4 years works experience.
8.Farm already in operation, machines can be setup immediately;
9.Power consumption calculated accurately.

Location:            Xinjiang/Neimenggu      
Price (full year):         0.055usd per kwh.
Electricity Type:         Coal Power            
Operational Start Date:   2018   
Electricity Loss:         3%                  
Minimum Quantity:      40pcs
Supported Hardware:      Asic miner(big hashrate)   
Remaining Capacity:      10000pcs
Other Costs:            None


Shenzhen Cooldragon Technology Co., Ltd.
Ken Kong
Phone/Wechat/Whatsapp: +8615889605448
Email:            [email protected]
20200420
Jump to: