Waste is everywhere on the planet. But waste also means energy. This energy remains unused in many countries. The reasons are lack of knowledge on how to use it in a useful way, lack of infrastructure or financial bottleneck.


Green circle of energy is a project which stands for the modular construction of a wide range of waste recycling system. These recycling system also enable an energy-efficient solution for the wide problem of wastes in poorer countries. Green circle of energy builds compact modular waste recycling system be delivered easily to all countries. In a first step, Green circle of energy will construct a biogas plant for a selected location, e.g. Philippines, Brazil, or India. This will be a first part of the overall modular recycling structure.


Green circle of energy has a vision.


Make it possible.



1. Timeline
a. Company founded    1-6 months
b. Studies    1-6 month
c. Calculations    1-6 months
d. Cryptocurring glaze    1-6 months
e. Integration of ICO currency    1-12 month
f. Development Bio-gas    7-18 month
G. Prototype manufacturing    19-24 month
H. On-site testing / monitoring and remote access recording    25-30 months
i. Optimize    31-36 month
j. Series production Bio-Gas   on going
k. Development of the next container level   on going

2. Process Mapping
a. formation
At this stage, the project idea is detected and illustrated in a study. To implement this project, a company is founded in Switzerland, which leads and accompanies the project. At this time, the other projects and their order are defined.
Also, the cryptocurrency is lacquered as ERC 20 and the existing ICO Coins are integrated.

b. Development
The development of the first stage "Bio-Gas" is being implemented. During this period, a complete container-sized biogas plant will be developed.

c. Processing
The first biogas plant is produced and put into operation.

d. Testing
The prototype plant will be operated and tested in the destination country under the real conditions. All information is controlled remotely and recorded for the evaluation and optimization of the upcoming plants.

e. Optimize
Using the information obtained, the design is revised and developed so that an optimal state-of-the-art bio-gas plant is produced in series.