Nice work...Looks very nicely done and it seems like you put in a lot of thoughts to secure yourself from surge and faults...
What kind of fused PDU's are you using?
Are they 30 amps or 20 amps?
Are you using 208 volt or 240 volt?
Line to Line or Line to neutral?
2 pole breakers or 3 pole breakers?
Thanks man! Putting this rig together was basically my life for about 4 months this earlier this year. Previously I had a couple racks of S9's and S7's, about 25 machines total, and before that about a dozen S5's and some GPU rigs. Now it's over 80 machines, mostly S9's but a few 741's. We're running just shy of 1.1Ph currently.
They are combination of HP and Dell PDU's we bought surplus. Can't remember the specific models off the top of my head. I have a few metered APC's also sprinkled in there.
30 amp circuits
208v
Line to Line
2 Pole
We have all the network gear on 120v with UPS's. The EBA on the main panel was a but expensive, but it's protecting about a lot of gear so I guess it's all relative.
Here is how the rig looks from the front:
So we're running single phase line to line 30 amp circuits off the 3 phase power center. Matches the PDU's. We have 4 miners per circuit and we have the load balanced between the phases pretty good, around 5% or less per leg. I wish we could run more gear, but the building transformer is 150KVa and we're running it about as hard as we can while still leaving a 20% safety margin. We're going to squeeze a few more units in soon, but it will be limited. We inquired about upgrading, but the distribution center for the entire building is only 800amps and the cost to change the transformer and the distribution center came in at around $60k and we decided if we really want to expand we need to find another building.
I'll tell you one thing, anyone who thinks mining is easy can get out of here. It's nothing but work!