contact me over telegram at @rwvkllc
Can't get enough? See our telegram channel for live updates:
http://www.t.me/kaboomracks~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Fully Built out Mining facility for Sale4.2c/kwh all-in power rate
Primary Transformer capacity of 240 KW. Upgradeable to 1MW
240KW of Equipment can be plugged in today
3700 sq ft
$2100/mo lease
Located in
Arcade. NY$100K or best offerLand Suitable for Bitcoin Mine for Sale15 acres in
West Texas, USA7 MW currently available on the lines at 4.35 cents/kwh all-in
Option to build 90 MW substation at low cost (~$1M estimate, the property has the high-voltage transmission lines already on it)
With substation, all in cost of power drops to 3.75 cents/kwh
Price not listed, best offerReal Estate Suitable for Bitcoin Mine for SaleLocated in
Washington State, 9 acre site
Located in county friendly to bitcoin miners
Includes contract for 10 MW of power at 3.5 cents/kwh all-in
No existing primary infrastructure but it can be brought in cheaply; next to substation
50,000 square feet building
$2.98M or best offer1.6MW Mining Facility for Sale In Montreal, Quebec, CanadaCAD 0.06 / kWh all-in power cost
CAD 9000 / month lease
3000AMP entrance and 2000kVA transformer
Up and running since March 2018
13,200 sqft
Asking price:
USD 400k or best offerData Center for Salereal datacenter whitespace3.6 c/kwh all-in power rate
Primary Transformer capacity of 3.8 MW
2.0 MW of Equipment can be plugged in today
610 tons of chillers
14,000 sq ft of raised floorspace
Includes Backup Generator
Located in Houston, Texas
$2.9M or best offerBitcoin Mine in Washington State for SaleNewly Purchased Miners Included
$0.06 cents/kwh all-in power rate
1600AMP @ 480v build out operating at 60% capacity
$750,000 USD or best offer5 year lease at $5465/month with 5 year extension option
Top of Line Mechanical System, 8500 sqft
Included Equipment: 514 DragonMint T1, 4 DragonMint B29
Data Center for SaleLocated in
Spokane, Washington5.5 c/kwh all-in cost of power
$90k or best offer1 MW Primary Transformer
$3,650/month lease
220 KW of Equipment can be plugged in today
AC/Chillers Racks, switched PDUs, Networking Gear, Security System, Temperature Monitoring
Backup Generator
50 MW of Power and Land Available for Mining Containersfully prepped site with concrete foundation in USA5-20 MW usage:
4.95 cents/kwh all-in power cost
20 MW+ usage:
negotiable- use of land is free, power stepped down to 480V at no cost
- fenced, 24 hour a day monitoring and security
- fiber internet available with redundant ISPs
- optional miner maintenance service contract provided
- 3-5 year contract, 4 months security deposit
- power ready March 1st or earlier
- 5 MW minimum
- located in Colorado
4.5 MW Bitcoin Mine for Sale45 minutes from Montreal2.4 MW fully built out
0.053 CAD/kwh all-in power cost
lease rate negotiable:
~15,000 CAD/month$700,000 CAD or best offer#realestate #canada
2 MW Bitcoin Mine for Sale40,000 sqft on 5 acres
7.7 cents/kwh all-in power cost (can be negotiated down by large buyer)
2 MW primary transformer, up to 10 MW available from PUD
1.2 MW fully built out and ready to mine
115ton HVAC moves 100,000 cfm
In Canton, South Dakota
$1.79M or best offer30 MW of Power and Land Available for Mining Containersfenced, 24 hour a day monitoring and security, concrete foundation
5.25 cents/kwh all-in power cost- free lease with power stepped down to your voltage at no charge
- fiber internet available with redundant ISPs
- optional miner maintenance service contract offered
- 1-2 year contract, 2 months security deposit
- power ready April 1st or earlier
- 1 MW minimum
- located in Georgia
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
contact me over telegram at @rwvkllc
Can't get enough? See our telegram channel for live updates:
http://www.t.me/kaboomracks