Author

Topic: Mining farm electricity requirement question (Read 161 times)

legendary
Activity: 1988
Merit: 1561
CLEAN non GPL infringing code made in Rust lang
January 28, 2023, 10:23:16 PM
#10
You don't need the J+ for 277V, Bitmain in their usual wisdom does not really market that they in fact have PSUs for x19 family for 277V: APW12A and APW121215g. Newer miners require the later but even the original S19 Pro 110 would work with the first all these years the model has been out... Feel free to ask them why they don't bother listing those. I don't know if there is a variant of the APW121417 for 277V, maybe there is...
full member
Activity: 183
Merit: 112
Just digging around
Wiring up properly is the tricky/important part as up to the transformer it's high voltage and the power company is the one doing it.
I mean without burning the building down sooner than later.

hello, had a question about electricity requirements. for a 3MW mining farm, what are the usual transformer/power requirements in the US?

legendary
Activity: 4102
Merit: 7765
'The right to privacy matters'
hello, had a question about electricity requirements. for a 3MW mining farm, what are the usual transformer/power requirements in the US?


Finally got to this.

3MW only allows 75-80% so 3mw transformer will do 2.25Megawatts to 2.40Megawatts.

Many people would want a pair of 2megawatt transformers.

why well if one fries itself only ½ the farm goes down.

if you found two 2.0MVA transformers you could do 1.50 to 1.60 on each one.

thus a true 3.0megawatt farm.

here is one I have heard issues about availability for these.

https://www.larsonelectronics.com/product/283593/2000-kva-pad-mount-transformer-13200v-delta-primary-480y-277-wye-secondary-knan-bell-green?


this one does do 480y-277 wye secondary which will work with this miner.

https://shop.bitmain.com/product/detail?pid=00020230108213609854b369SGwI0654
hero member
Activity: 728
Merit: 512
You get the transformer from the power company, at least the places I know. Assuming the location can be serviced with such amount of power.
Apart from just getting the transformer from the power company he can also do well to get into an agreement with an electricity company (they could set up every requirement needed) on how much power they could supply to hi. It could be on a cost effective rate based on their MOU.
legendary
Activity: 1988
Merit: 1561
CLEAN non GPL infringing code made in Rust lang
There is nothing to be angry about, its more customers for them and the large miners install their facilities in industrial zones where noise is allowed.

This is the same as any other technological industrial activity like a data center. Only fools would ban this wealth creation activity, compared to other industries it is far more clean.
hero member
Activity: 938
Merit: 642
Magic
One of the place in U.S which is Texas has some of the lowest
kilowatt hour prices in America.


But they also have a rising anger about mining operations, because of the high power draw and also the loud noises that come form mining facilities. So you should also consider that you may be not extremely welcome if you want to build a large operation.
sr. member
Activity: 1666
Merit: 453
Crypto Swap Exchange
hello, had a question about electricity requirements. for a 3MW mining farm, what are the usual transformer/power requirements in the US?


As far as I know mining operations go where energy is cheap. One of the place in U.S which is Texas has some of the lowest
kilowatt hour prices in America.

But in terms of transformer they used, I had no idea what it is?
hero member
Activity: 938
Merit: 642
Magic
If you want that kind of power you would in most cases also get a specific contract with your power supplying company. You can't just simply hook up your miners with a standard household contract. In this contract it would also be specified that they deliver up to X amount of MW to your location and at what price. In some cases it could be that it is not getting cheaper the more energy you need. Maybe the infrastructure can only provide a specific amount at low cost.
full member
Activity: 183
Merit: 112
Just digging around
You get the transformer from the power company, at least the places I know. Assuming the location can be serviced with such amount of power.
newbie
Activity: 26
Merit: 0
December 31, 2022, 12:43:06 AM
#1
hello, had a question about electricity requirements. for a 3MW mining farm, what are the usual transformer/power requirements in the US?
Jump to: