Hard to find a space with 480v under 3,000 sqft.
Power is the main thing with a mine. Try to get a spot with the right power coming in already would be my advice. If the space is too large then sublet some of the space.
If you have a location that is perfect (right size, right price, good location, has security) then compromise on the power coming in. Getting up and running quickly and staying running will be paramount to ensuring profit, even with a non-ideal electrical service. Here is a possible strategy: With industrial spaces you can sometimes get multiple electrical services brought in. Start with the existing 208V 3 phase and add on or build out the larger system in parallel.
Where I am a new electrical service is tens of thousands for an industrial space with long lead times.So if the property is too big and has the right power, better to pay that extra on the purchase price of the property instead of later.