Author

Topic: [WTS] 300kW air cooled mining facility (Read 57 times)

hero member
Activity: 723
Merit: 519
November 16, 2023, 09:06:41 AM
#1
Located in Southeast Missouri

300kVa Transformer
1200 amp 3-phase 208v (strictly for miners)
(20) 60amp circuits
(5) 10,000 cfm exhuaust fans
(4) 60x60 air intake louvers with washable Merv4 & Merv 11 filters
(8 ) 30x30 air intake louvers with washable Merv6 & merv 11 filters

(20) 48 amp APC pdu's
will include enough ethernet and power cables to run 100 s19s (s19s not included)

Building also has a separate 400 amp single phase electric service which runs exhaust fans lighting, etc,  2 bathrooms, overhead led lighting water softener, drinking fountain, etc

SERIOUS INQUIRES ONLY, PLEASE DM

$275,000
Jump to: