Pages:
Author

Topic: 696 ASICMINER shares for auction - page 6. (Read 7462 times)

legendary
Activity: 2156
Merit: 1072
Crypto is the separation of Power and State.
February 04, 2013, 03:28:12 AM
#10
25 @ 0.21
full member
Activity: 163
Merit: 100
February 04, 2013, 12:57:09 AM
#9
696 @ 0.2 BTC
donator
Activity: 1120
Merit: 1001
February 04, 2013, 12:45:12 AM
#8
696 @ 0.185 BTC
full member
Activity: 163
Merit: 100
February 04, 2013, 12:21:23 AM
#7
696 @ 0.175 BTC
full member
Activity: 178
Merit: 100
February 04, 2013, 12:18:52 AM
#6
696 @ 0.15 BTC
hero member
Activity: 745
Merit: 501
February 04, 2013, 12:12:25 AM
#5
I forgot the end date. 7 days from the auction start, auction extends for 24h after the last bid.
full member
Activity: 173
Merit: 102
February 03, 2013, 11:54:40 PM
#4
50 @ .11
legendary
Activity: 1260
Merit: 1000
Drunk Posts
February 03, 2013, 11:53:15 PM
#3
696 @ 0.1
hero member
Activity: 745
Merit: 501
February 03, 2013, 11:51:30 PM
#2
Format example:
XX @ 0.10 BTC
hero member
Activity: 745
Merit: 501
February 03, 2013, 11:45:15 PM
#1
Hello,

I would like to put up for auction my 696 ASICMINER shares.

This is 696/400 000 shares of ASICMINER or 0.174% (200 000 sold for funding, 200 000 kept by company)

Info about these shares:
- 10 to 12 TH total planned in early february to mine for shareholders
- 6x increase planned in a second batch
- Further expansion possible
- Share of profit from sale of units
- Ownership of an ASIC manufacter, long-term potential

Starting bid: 0.10 BTC (IPO price)
Minimum increments: 0.01 BTC

You may bid for a partial stack of shares, minimum 25. The higher bidder displace lower bidders until there's no shares left.

There is an undisclosed reserve price tied to this auction under which I will not sell.


Update

We are on our revised timeline, and are about to deploy 800 hashing boards in early February. The picture down below is the QC device we are about to take to the assembling service before we pick up all the assembled boards tomorrow:

small:


large:


The board on the upper-left is the power supply module. The upper-right one is the back side of the hashing board with VM connectors and heatsinks attached on. The bottom-left one is the front side of the hashing board without DIP components or heatsinks. The bottom-right one is the tester for QC, and it will be replaced by the controller board in real use.

A more detailed update is given to the board. Please note that the board member list has met its first adjustment, removing shareholders who hold much less than 5,000 after the initial offering from the board.

Update

All confirmations including GLBSE-only ones (who haven't claimed to us) have been sent. For shareholders who haven't received any, please check your spam folder, and report to us if you still couldn't find them.

Well, now that Avalon apparently shipped, would you like to give an estimate on when we start hashing and how many TH/s are we looking at?
Considering the yield rate (including chips themselves, assembling, and other uncertainties) and the overclocking opportunity we are looking at over 10TH/s and under 12TH/s for the whole first batch and sixfold for the second.

See the full thread: https://bitcointalksearch.org/topic/asicminer-entering-the-future-of-asic-mining-by-inventing-it-99497
Pages:
Jump to: