Author

Topic: [ANN] Spondoolies-Tech - carrier grade, data center ready mining rigs - page 181. (Read 1260290 times)

legendary
Activity: 4256
Merit: 8551
'The right to privacy matters'
please help..



go to settings page and lower the settings

save the new settings

start the miner wait 10 minutes and check your stats page

legendary
Activity: 1120
Merit: 1001




which one of those SLOTS labeled as 1,2,3,4 are the slots that power the back chips ?
Thank you !
hero member
Activity: 560
Merit: 500
updated my SP20E with the lastest firmware and I also see that my miner doesn't react the same way with the Asic temp. Looks like it's less aggressive. My temp are going down and the speed doesn't ajust.

I will roll back to 2.6.1
o
Please attach asic stats, and does  problem reproduce without autofans?
hero member
Activity: 560
Merit: 500
Has anyone that has upgraded to firmware 2.6.9 seen slightly slower hash rate? I've flashed 6 SP20's and everyone of then is  10-20GH/s slower vs firmware 2.6.4. Just curious if anyone else is seeing the same.

Yep the same behavior. Less aggressive with the hashrate even if the temp goes down.

On auto fans? Or on any fans?
alh
legendary
Activity: 1846
Merit: 1052
NOTE I HAVE PSU TO SPARE. So my argument is for me no one else unless you have psu's to spare

cloud mining is just wicked hard to make money doing.

I read the contract  a few times and I do not like this line :

b. USD 0.0015 per GH/s and day, deducted on a daily basis* from the generated Coins


1000gh = 1.50 usd a day  or 45 usd a month

if I downclock 1 sp20 to 1000gh I will spend 470 watts on my kwatt meter x 24 = 11.128 kwatts a day make it 12 kwatts a day or

360 kwatts a month 12 cents  a kwatt = 43.2 usd a month.


 I have the sp20 in hand  I got one on ebay for 392 after discounts

There is a solid ebay seller asking 420 a unit or best offer.

so buying 1000 gh in the cloud from genisis cost more up front 446 or 469   vs  390-410

and more to run 45 usd vs 43.2usd at 12 cents a kwatt.

with one setup I have nothing  ie the cloud contract is basically nothing .  the other I have a miner.

the cloud 469 out of pocket then 45 usd a month    

the ebay buy 392 out of pocket then 36 a month my power is 10 cents until summer rates.

So genesis is just too much money for me. If it were June 1st and my power moves from 10 to 16 cents yeah I may do it. not now.

I need to do better then buying one on ebay ..

  which means under 392  and under 36 usd a month.  with some kind of buy back after 90 days.==== this would equal the ebay deal not beat it.

These are my circumstances  so I understand if you have :

 A) no space
B) power over 15 cents
C) want coins  + some type of mining

 but genesis Just does not fit for me and does  not fit until June (maybe).




One minor quibble. I don't think the fact that that you have a spare PSU really changes the thinking a whole lot. I didn't realize until this year that a solid, reliable, PSU is an actual investment that can last. You yourself have time and again re-used a PSU for a new generation of mining hardware. While it clearly costs money to purchase a solid PSU, it will probably retain it's value way beyond the ASIC hardware that it powers for a long time to come. Even if you spend say $130 for the PSU, in one year you will still have a PSU of significant value, either for further use, or sale.
legendary
Activity: 1638
Merit: 1005
Has anyone that has upgraded to firmware 2.6.9 seen slightly slower hash rate? I've flashed 6 SP20's and everyone of then is  10-20GH/s slower vs firmware 2.6.4. Just curious if anyone else is seeing the same.

Yep the same behavior. Less aggressive with the hashrate even if the temp goes down.
legendary
Activity: 1638
Merit: 1005
updated my SP20E with the lastest firmware and I also see that my miner doesn't react the same way with the Asic temp. Looks like it's less aggressive. My temp are going down and the speed doesn't ajust.

I will roll back to 2.6.1
donator
Activity: 1414
Merit: 1051
Spondoolies, Beam & DAGlabs
member
Activity: 118
Merit: 10

Guy is very positive person Smiley But his pronunciation isn't so positive Cheesy
Is there a transcription of this panel of conference? It's interesting to read sharks of business.
legendary
Activity: 4256
Merit: 8551
'The right to privacy matters'
I'm getting this and around 150GH less than my other 3 SP20s:

LOOP[0] ON TO:0 (w:26)
 0: DC2DC/1/:[vlt1:742 vlt2:749(DCl:794 Tl:794 Ul:759) 107W 144A  54c] ASIC:[ 85c (125c) 1040hz(BL:1040)   18 (E:193) F:0 L:0]
 1: DC2DC/1/:[vlt1:742 vlt2:749(DCl:794 Tl:794 Ul:759) 116W 154A  75c] ASIC:[ 95c (125c) 1120hz(BL:1120)    8 (E:193) F:0 L:0]
LOOP[1] ON TO:0 (w:25)
 2: DC2DC/1/:[vlt1:740 vlt2:746(DCl:794 Tl:794 Ul:759) 120W 161A  82c] ASIC:[110c (125c) 1130hz(BL:1130)   25 (E:193) F:0 L:0]
3: disabled (Very Evil ASIC)
LOOP[2] ON TO:0 (w:35)
 4: DC2DC/1/:[vlt1:734 vlt2:738(DCl:794 Tl:794 Ul:759) 115W 156A  58c] ASIC:[ 85c (125c) 1130hz(BL:1130)   18 (E:193) F:0 L:0]
 5: DC2DC/1/:[vlt1:734 vlt2:741(DCl:794 Tl:794 Ul:759) 115W 155A  78c] ASIC:[ 85c (125c) 1130hz(BL:1130)   17 (E:193) F:0 L:0]
LOOP[3] ON TO:0 (w:30)
 6: DC2DC/1/:[vlt1:724 vlt2:733(DCl:794 Tl:794 Ul:759) 116W 158A  86c] ASIC:[120c (125c) 1120hz(BL:1120)   13 (E:191) F:0 L:0]
 7: DC2DC/1/:[vlt1:716 vlt2:719(DCl:794 Tl:719 Ul:759) 111W 155A  95c] ASIC:[120c (125c) 1110hz(BL:1110)   17 (E:191) F:0 L:0]

What does Very Evil ASIC mean?  I've tried numerous power cycles and undervolting, keeps disabling.


try :

Fan speed ---- 80
 Start volts   

1---------------0.62
2---------------0.62
3---------------0.62
4---------------0.62

Max volt-------0.625

psu power

1--------------- 125 watts
2----------------125 watts
3----------------125 watts
4----------------125 watts

Restart miner if rate below 600


see if it does it.



hero member
Activity: 572
Merit: 500
I'm getting this and around 150GH less than my other 3 SP20s:

LOOP[0] ON TO:0 (w:26)
 0: DC2DC/1/:[vlt1:742 vlt2:749(DCl:794 Tl:794 Ul:759) 107W 144A  54c] ASIC:[ 85c (125c) 1040hz(BL:1040)   18 (E:193) F:0 L:0]
 1: DC2DC/1/:[vlt1:742 vlt2:749(DCl:794 Tl:794 Ul:759) 116W 154A  75c] ASIC:[ 95c (125c) 1120hz(BL:1120)    8 (E:193) F:0 L:0]
LOOP[1] ON TO:0 (w:25)
 2: DC2DC/1/:[vlt1:740 vlt2:746(DCl:794 Tl:794 Ul:759) 120W 161A  82c] ASIC:[110c (125c) 1130hz(BL:1130)   25 (E:193) F:0 L:0]
3: disabled (Very Evil ASIC)
LOOP[2] ON TO:0 (w:35)
 4: DC2DC/1/:[vlt1:734 vlt2:738(DCl:794 Tl:794 Ul:759) 115W 156A  58c] ASIC:[ 85c (125c) 1130hz(BL:1130)   18 (E:193) F:0 L:0]
 5: DC2DC/1/:[vlt1:734 vlt2:741(DCl:794 Tl:794 Ul:759) 115W 155A  78c] ASIC:[ 85c (125c) 1130hz(BL:1130)   17 (E:193) F:0 L:0]
LOOP[3] ON TO:0 (w:30)
 6: DC2DC/1/:[vlt1:724 vlt2:733(DCl:794 Tl:794 Ul:759) 116W 158A  86c] ASIC:[120c (125c) 1120hz(BL:1120)   13 (E:191) F:0 L:0]
 7: DC2DC/1/:[vlt1:716 vlt2:719(DCl:794 Tl:719 Ul:759) 111W 155A  95c] ASIC:[120c (125c) 1110hz(BL:1110)   17 (E:191) F:0 L:0]

What does Very Evil ASIC mean?  I've tried numerous power cycles and undervolting, keeps disabling.


I guess it's very red and hot .. the bottom ones seem at the limit too.
hero member
Activity: 882
Merit: 1003
NOTE I HAVE PSU TO SPARE. So my argument is for me no one else unless you have psu's to spare

cloud mining is just wicked hard to make money doing.

I read the contract  a few times and I do not like this line :

b. USD 0.0015 per GH/s and day, deducted on a daily basis* from the generated Coins


1000gh = 1.50 usd a day  or 45 usd a month

if I downclock 1 sp20 to 1000gh I will spend 470 watts on my kwatt meter x 24 = 11.128 kwatts a day make it 12 kwatts a day or

360 kwatts a month 12 cents  a kwatt = 43.2 usd a month.


 I have the sp20 in hand  I got one on ebay for 392 after discounts

There is a solid ebay seller asking 420 a unit or best offer.

so buying 1000 gh in the cloud from genisis cost more up front 446 or 469   vs  390-410

and more to run 45 usd vs 43.2usd at 12 cents a kwatt.

with one setup I have nothing  ie the cloud contract is basically nothing .  the other I have a miner.

the cloud 469 out of pocket then 45 usd a month   

the ebay buy 392 out of pocket then 36 a month my power is 10 cents until summer rates.

So genesis is just too much money for me. If it were June 1st and my power moves from 10 to 16 cents yeah I may do it. not now.

I need to do better then buying one on ebay ..

  which means under 392  and under 36 usd a month.  with some kind of buy back after 90 days.==== this would equal the ebay deal not beat it.

These are my circumstances I understand if:

 A) no space
B) power over 15 cents
C) want coins  + some type of mining

Just does not fit for me and does not fit until June.





Well done
hero member
Activity: 742
Merit: 500
Quote
3: disabled (Very Evil ASIC)

That is gen 9 asics, 1 single asic at 9,69th/s Tongue
hero member
Activity: 979
Merit: 510
I'm getting this and around 150GH less than my other 3 SP20s:

LOOP[0] ON TO:0 (w:26)
 0: DC2DC/1/:[vlt1:742 vlt2:749(DCl:794 Tl:794 Ul:759) 107W 144A  54c] ASIC:[ 85c (125c) 1040hz(BL:1040)   18 (E:193) F:0 L:0]
 1: DC2DC/1/:[vlt1:742 vlt2:749(DCl:794 Tl:794 Ul:759) 116W 154A  75c] ASIC:[ 95c (125c) 1120hz(BL:1120)    8 (E:193) F:0 L:0]
LOOP[1] ON TO:0 (w:25)
 2: DC2DC/1/:[vlt1:740 vlt2:746(DCl:794 Tl:794 Ul:759) 120W 161A  82c] ASIC:[110c (125c) 1130hz(BL:1130)   25 (E:193) F:0 L:0]
3: disabled (Very Evil ASIC)
LOOP[2] ON TO:0 (w:35)
 4: DC2DC/1/:[vlt1:734 vlt2:738(DCl:794 Tl:794 Ul:759) 115W 156A  58c] ASIC:[ 85c (125c) 1130hz(BL:1130)   18 (E:193) F:0 L:0]
 5: DC2DC/1/:[vlt1:734 vlt2:741(DCl:794 Tl:794 Ul:759) 115W 155A  78c] ASIC:[ 85c (125c) 1130hz(BL:1130)   17 (E:193) F:0 L:0]
LOOP[3] ON TO:0 (w:30)
 6: DC2DC/1/:[vlt1:724 vlt2:733(DCl:794 Tl:794 Ul:759) 116W 158A  86c] ASIC:[120c (125c) 1120hz(BL:1120)   13 (E:191) F:0 L:0]
 7: DC2DC/1/:[vlt1:716 vlt2:719(DCl:794 Tl:719 Ul:759) 111W 155A  95c] ASIC:[120c (125c) 1110hz(BL:1110)   17 (E:191) F:0 L:0]

What does Very Evil ASIC mean?  I've tried numerous power cycles and undervolting, keeps disabling.
legendary
Activity: 4256
Merit: 8551
'The right to privacy matters'
NOTE I HAVE PSU TO SPARE. So my argument is for me no one else unless you have psu's to spare

cloud mining is just wicked hard to make money doing.

I read the contract  a few times and I do not like this line :

b. USD 0.0015 per GH/s and day, deducted on a daily basis* from the generated Coins


1000gh = 1.50 usd a day  or 45 usd a month

if I downclock 1 sp20 to 1000gh I will spend 470 watts on my kwatt meter x 24 = 11.128 kwatts a day make it 12 kwatts a day or

360 kwatts a month 12 cents  a kwatt = 43.2 usd a month.


 I have the sp20 in hand  I got one on ebay for 392 after discounts

There is a solid ebay seller asking 420 a unit or best offer.

so buying 1000 gh in the cloud from genisis cost more up front 446 or 469   vs  390-410

and more to run 45 usd vs 43.2usd at 12 cents a kwatt.

with one setup I have nothing  ie the cloud contract is basically nothing .  the other I have a miner.

the cloud 469 out of pocket then 45 usd a month    

the ebay buy 392 out of pocket then 36 a month my power is 10 cents until summer rates.

So genesis is just too much money for me. If it were June 1st and my power moves from 10 to 16 cents yeah I may do it. not now.

I need to do better then buying one on ebay ..

  which means under 392  and under 36 usd a month.  with some kind of buy back after 90 days.==== this would equal the ebay deal not beat it.

These are my circumstances  so I understand if you have :

 A) no space
B) power over 15 cents
C) want coins  + some type of mining

 but genesis Just does not fit for me and does  not fit until June (maybe).


hero member
Activity: 546
Merit: 500
Biodom, where is the auto that you were posting about for upper volt limit? I upgraded to 2.6.9 but don't see it. I see a scheduling feature which is new.

Sorry, corrected typo, meant wattage plus I probably was not very specific: auto if for fans, of course, but if you set auto for fans and a certain upper voltage limit, then you DO NOT have to adjust upper wattage level since the machine will adjust each different loop at a specific voltage and wattage (as long as it is below your upper voltage limit).

What I was getting at is that this (wattage) would be different for each loop and you won't be able to achieve this if you use limited power setting for watts (like 160-165 instead of 288)

Thanks, I thought I was missing something new. That is what I am doing with one next to my desk, fan bearable and still getting 1400 GH/s.
legendary
Activity: 3892
Merit: 4331
Biodom, where is the auto that you were posting about for upper volt limit? I upgraded to 2.6.9 but don't see it. I see a scheduling feature which is new.

Sorry, corrected typo, meant wattage plus I probably was not very specific: auto if for fans, of course, but if you set auto for fans and a certain upper voltage limit, then you DO NOT have to adjust upper wattage level since the machine will adjust each different loop at a specific voltage and wattage (as long as it is below your upper voltage limit).

What I was getting at is that this (wattage) would be different for each loop and you won't be able to achieve this if you use limited power setting for watts (like 160-165 instead of 288)
sr. member
Activity: 471
Merit: 250
Just registered with Genesis to have a look around the site ... it won't accept my BTC address, even tried a few different ones.

Keep getting "You don't have a Bitcoin wallet yet? Click here to get started!"

Not saying I'll start cloud mining, just poking around ... taking it all in.

Jump to: