Update 07 Jul 2014:We are pleased to report several positive developments.
Offering on Havelock:• DataTank Mining has received enough funding via direct investments in the pre-offering phase to proceed with the business plan.
• Offering of single DataTank Mining units on HavelockInvesetments.com has been cancelled for the time being. The internal platform (control panel) will be developed in parallel to the initial DataTank systems.
• The prospectus will be updated in the near future to reflect latest information and further changes. Most significant changes are that DTMA units (capacity and mining hardware) won't be necessary in its current form. This is a step towards reducing investment risks and making DataTank Mining a more predictable venture. DTMA and investment in future hardware for future deployment has caused confusion that can be avoided (we are working with DTMA direct investors to convert units).
• Direct investments into capacity units are always welcome by emailing to
[email protected]. Please note that until the internal platform is available, a minimum purchase of 10,000 units (edit: 100kW).
• We apologize for the dust to the community and to HavelockInvesetments.com, please bear with us to make this not only the most efficient mining venture, but also to raise the bar for safe mining investments. We plan to make this as predictable as possible for participants and partners.
Other Information:• Production for DataTank No. 1 has already commenced and AM BE200 hardware is the hardware of choice for initial deployment. We are currently evaluating if Scrypt hardware will be available in time for at least a partial deployment to use some spare capacity.
• We keep working with ASIC manufactures for their current and future chips to make them available as immersion blades. We are also offering capacity in DataTank systems and prototyping runs to existing and new ASIC manufacturers to get their hardware immersion ready.
• We will keep working on hardware support, deployment locations, and other partnerships while the initial DataTank container systems are built for deployment.
• We would like to re-emphasize that DataTank systems and the operation expenses include everything required for mining, including electrical switchgear, transformers, power supplies, cooling, rents, 24/7 on-site support staff, iPhone control panel, and anything else that is needed for operation. There are _no_ other costs.
• Reselling of ASIC hardware for air cooling users will be possible. Please note that immersion blades are based on a dual design for immersion and air cooling (1U form factor or tube-like) and we encourage manufacturers to follow our design guidelines.
https://www.googledrive.com/host/0ByWHHc0u_thNT293cTl6OXBVZms/AirCooling_01.pdfhttps://github.com/blockerupter/AM_Tube/blob/master/complete_set.pnghttps://docs.google.com/uc?export=download&id=0ByWHHc0u_thNdzB3c2hvVzJkcTQ• If reselling for air-cooling is indeed in demand by Q4 2014 or Q1 2015, DTM will make available at-cost DIY reselling packages that consist of inexpensive cardboard boxes, thermal paste, heatsinks and fans, with a compartment for immersion blades. DTM will also offer shipping services at a transparent small fee to unit holders to liquidate their hardware (with or without air cooling kit).
Please also follow DataTank Mining on Twitter to receive updates:
http://www.twitter.com/DataTankMiningWe also posted a couple of videos recently showing several chips in action and will keep posting progress reports and pictures frequently:
http://www.vimeo.com/datatank/