31-Dec   15.00%   222,095,805
At that diff. and current $/btc, a 60GH/s single priced $1299 will make $450/month, pays itself back in 13 weeks,
At that diff. and current $/btc, a 50GH/s single priced $2499 will make $373/month, pays itself back in 29 weeks,
good enough for me.

Your math is flawed.  

Assuming the difficult continue to grow at 7.5% per week, your earning from 60GH will be:

$450 - 1st month
$315 - 2nd month
$220 - 3rd month
$154 - 4th month
$107 - 5th month
$75 - 6th month

Summing that up, and it will take 6 months or 24 weeks to earn back your $1299.    For the 50g/h at $2499, you will never make back your investment (and if you think bitcoin price will shoot up to $1000/btc.. you might as well spend the 2499 and buy the BTC today).

That's assuming late shipping of Dec 2013.  

Obviously, if you can receive the machine earlier, there will be some decent profit for both machine.
legendary
Activity: 2026
Merit: 1034
Fill Your Barrel with Bitcoins!
Maybe if everyone asked for a refund the difficulty would go down?
hero member
Activity: 568
Merit: 500
The calculator you use only has one level of difficulty. As mentioned in the OP, "Unlike the calculators used by the BFL and others which use only one level of difficulty the reality is that they increase dramatically throughout the year. A lot of people have been fooled by this and thought that they were on their way to retirement just by purchasing an order of mining equipment."

One has to take into account increasing difficulty each 2016 blocks roughly each two weeks to calculate the break even point as well as factoring in pool and power costs. What appears profitable at the beginning will change completely after each jump, in part demonstrated by the recent 28.4% jump in the last difficulty level.

Some mining calculators have started to include a factor for estimated difficulty level changes which is a great help to mining investors.

I hope your units arrive soon.

With maths like yours I can understand how BFL manages to sell so many pre-orders.  Wink

If you received delivery in January 2014 could not possibly make a profit on your investment of $2,499 as at 220,095,805 difficulty you will be earning around only $15.10 per day, reducing to $13.10 11th Jan 2014 , $9.99 at 2nd Feb 2014, and $4.90 at 29th March 2014, $2.50 at 23rd May and will have future increases in difficulty to overcome over the next 29 weeks.

I hope you have an earlier pre-order, so at least you can make some reasonable money.

31-Dec   15.00%   222,095,805
At that diff. and current $/btc, a 60GH/s single priced $1299 will make $450/month, pays itself back in 13 weeks,
At that diff. and current $/btc, a 50GH/s single priced $2499 will make $373/month, pays itself back in 29 weeks,
good enough for me.
http://www.alloscomp.com/bitcoin/calculator
Fill in 222 for the 15 mil. difficulty, like you suggested in your op, for December 2013, what does it give? If you think I will take your math over that, think again.
In you don't think a unit ordered today will arrive before 2014, don't order. I will as soon as the coins from my units roll in. And frankly, any place in the order queue not taken before me = better.
What do you mean with "one level of difficulty", that it shows the current difficulty only? Did you replace the 15605632.6813 diff. on that calculator by diff. 222605632.6813, filled in the hash rate and clicked calculate? Don't you agree with it's outcome, for that diff.?? If one takes your lower December 2013 number,  95442632 diff., it would be $1037 and $865 /month for the 60GH/s and 50GH/s models, btw.

member
Activity: 287
Merit: 10
The calculator you use only has one level of difficulty. As mentioned in the OP, "Unlike the calculators used by the BFL and others which use only one level of difficulty the reality is that they increase dramatically throughout the year. A lot of people have been fooled by this and thought that they were on their way to retirement just by purchasing an order of mining equipment."

One has to take into account increasing difficulty each 2016 blocks roughly each two weeks to calculate the break even point as well as factoring in pool and power costs. What appears profitable at the beginning will change completely after each jump, in part demonstrated by the recent 28.4% jump in the last difficulty level.

Some mining calculators have started to include a factor for estimated difficulty level changes which is a great help to mining investors.

I hope your units arrive soon.

With maths like yours I can understand how BFL manages to sell so many pre-orders.  Wink

If you received delivery in January 2014 could not possibly make a profit on your investment of $2,499 as at 220,095,805 difficulty you will be earning around only $15.10 per day, reducing to $13.10 11th Jan 2014 , $9.99 at 2nd Feb 2014, and $4.90 at 29th March 2014, $2.50 at 23rd May and will have future increases in difficulty to overcome over the next 29 weeks.

I hope you have an earlier pre-order, so at least you can make some reasonable money.

31-Dec   15.00%   222,095,805
At that diff. and current $/btc, a 60GH/s single priced $1299 will make $450/month, pays itself back in 13 weeks,
At that diff. and current $/btc, a 50GH/s single priced $2499 will make $373/month, pays itself back in 29 weeks,
good enough for me.
http://www.alloscomp.com/bitcoin/calculator
Fill in 222 for the 15 mil. difficulty, like you suggested in your op, for December 2013, what does it give? If you think I will take your math over that, think again.
In you don't think a unit ordered today will arrive before 2014, don't order. I will as soon as the coins from my units roll in. And frankly, any place in the order queue not taken before me = better.
hero member
Activity: 568
Merit: 500
With maths like yours I can understand how BFL manages to sell so many pre-orders.  Wink

If you received delivery in January 2014 could not possibly make a profit on your investment of $2,499 as at 220,095,805 difficulty you will be earning around only $15.10 per day, reducing to $13.10 11th Jan 2014 , $9.99 at 2nd Feb 2014, and $4.90 at 29th March 2014, $2.50 at 23rd May and will have future increases in difficulty to overcome over the next 29 weeks.

I hope you have an earlier pre-order, so at least you can make some reasonable money.

31-Dec   15.00%   222,095,805
At that diff. and current $/btc, a 60GH/s single priced $1299 will make $450/month, pays itself back in 13 weeks,
At that diff. and current $/btc, a 50GH/s single priced $2499 will make $373/month, pays itself back in 29 weeks,
good enough for me.
http://www.alloscomp.com/bitcoin/calculator
Fill in 222 for the 15 mil. difficulty, like you suggested in your op, for December 2013, what does it give? If you think I will take your math over that, think again.
In you don't think a unit ordered today will arrive before 2014, don't order. I will as soon as the coins from my units roll in. And frankly, any place in the order queue not taken before me = better.
member
Activity: 287
Merit: 10
Actually customers like to read reviews for products they are thinking about purchasing. If you are forking out your hard earned dollars the greater the depth of information the more useful the review. Go to Amazon and see which reviews get the best ratings.   

I don't think any new customers are going to take there time to read that absurdly long post  Cheesy
member
Activity: 287
Merit: 10
You are lucky to have got in before the herd and should hopefully make a very good return.

Good warning.
I preordered in March, hopefully it delivers while ROI is still very much possible  Roll Eyes
member
Activity: 287
Merit: 10
With maths like yours I can understand how BFL manages to sell so many pre-orders.  Wink

If you received delivery in January 2014 could not possibly make a profit on your investment of $2,499 as at 222,095,805 difficulty you will be earning around only $15.10 per day, reducing to $13.10 11th Jan 2014 , $9.99 at 2nd Feb 2014, and $4.90 at 29th March 2014, $2.50 at 23rd May and will have future increases in difficulty to overcome over the next 29 weeks.

I hope you have an earlier pre-order, so at least you can make some reasonable money.

31-Dec   15.00%   222,095,805
At that diff. and current $/btc, a 60GH/s single priced $1299 will make $450/month, pays itself back in 13 weeks,
At that diff. and current $/btc, a 50GH/s single priced $2499 will make $373/month, pays itself back in 29 weeks,
good enough for me.
sr. member
Activity: 353
Merit: 250
Rimbit - No mining, just development
You might want to consider his username too, ripple, seriously sounds like FUD to me.

 Was just going to comment on that... Hard to take anyone with a name like "Ripple" seriously, when it comes to BTC-related matters  Undecided

Yeah, I would have to agree with you on that. I have already encountered some sourpuss who has to much time on his hands and decides to talk rubbish. Much like my little sister who Gossips about things...  Grin
full member
Activity: 223
Merit: 100
Good warning.
I preordered in March, hopefully it delivers while ROI is still very much possible  Roll Eyes
legendary
Activity: 1652
Merit: 1067
Christian Antkow
You might want to consider his username too, ripple, seriously sounds like FUD to me.

 Was just going to comment on that... Hard to take anyone with a name like "Ripple" seriously, when it comes to BTC-related matters  Undecided
sr. member
Activity: 378
Merit: 250
I don't think any new customers are going to take there time to read that absurdly long post  Cheesy
sr. member
Activity: 392
Merit: 250
♫ A wave came crashing like a fist to the jaw ♫
You might want to consider his username too, ripple, seriously sounds like FUD to me.
hero member
Activity: 568
Merit: 500
31-Dec   15.00%   222,095,805
At that diff. and current $/btc, a 60GH/s single priced $1299 will make $450/month, pays itself back in 13 weeks,
At that diff. and current $/btc, a 50GH/s single priced $2499 will make $373/month, pays itself back in 29 weeks,
good enough for me.
legendary
Activity: 3583
Merit: 1094
Think for yourself
** Warning to New customers of Butterfly Labs Inc (BFL) **

"Any pre-orders placed now for any of Butterfly Lab’s units are not expected to ship until early 2014."

The above warning is from an article of June 5th on Butterfly Labs by Bitcoin commentator, Phil, in Mining News of the leading Bitcoin website, the Genesis Block.

Quote
Any pre-orders placed now for any of Butterfly Lab’s units are not expected to ship until early 2014.

This guy saying so constitutes objective truth?

Sounds more like opinion to me.  I guess we'll see if this common taters opinion is accurate or not.

All I see is the robot from Lost in Space swinging his arms yelling Warning Warning BFL is Shipping.
member
Activity: 111
Merit: 10
I think there is something about BFL in how they targeted smaller mining operations, encouraging people with 5Ghz units which cost every little where as most other minors seem to target selling very expensive but still powerful devices. I don't believe BFL is a scam but I do think they're just that bit too dodgy to touch unless you like to live dangerously.

Personally I think the market value of bitcoins are getting somewhat unstable right now, better to hold out, there will be newer generations of miner either way, it's just keeping an eye out on which maker to put your money on when the time comes.
member
Activity: 287
Merit: 10
** Warning to New customers of Butterfly Labs Inc (BFL) **

"Any pre-orders placed now for any of Butterfly Lab’s units are not expected to ship until early 2014."

The above warning is from an article of June 5th on Butterfly Labs by Bitcoin commentator, Phil, in Mining News of the leading Bitcoin website, the Genesis Block.

This warning is intended for new customers thinking of placing an order in the near future with butterfly labs Inc (BFL) for mining equipment. It is not intended to be of concern to existing customers with pre-orders, and also it relates to ASIC mining equipment only as opposed to ASIC chips for whic BFL may have a different promised delivery schedule.

Quote
Butterfly Labs claims they have shipped all Jalapeno 5 GH/s ASIC bitcoin miners ordered through July 3rd, 2012 have been shipped. ASIC miners are customized hardware used for bitcoin mining. Although Butterfly labs was one of the first companies to take pre-orders for ASIC hardware, Avalon and ASICMiner have been shipping for several months now.

Butterfly Labs has been plagued with power issues for months, perpetually telling miners they are two weeks away from delivery. They missed their power target, forcing them to forfeit 1,000 bitcoins to charity after a failed wager. The size of these 5 GH/s miners is over twice as big as originally forecast to accommodate the redesigned boards.

There is no word yet on expected deliveries of their 30 GH/s, 60 GH/s or 1,500 GH/s miners shipping yet. These units are expected to have similar size issues as the 5 GH/s miners and there are rumors that Butterfly Labs will ship multiple units to customers in order to achieve the expected hashing rate. Certainly, after a year of waiting, most customers will be happy to just start mining. Any pre-orders placed now for any of Butterfly Lab’s units are not expected to ship until early 2014.

New customers for BFL rigs should be aware that Butterfly Labs have a history of long delayed shipment orders and may wish to further inform themselves about the risks they face if they were to place an order with BFL.

It is likely that by early 2014 the existing ASIC product line will be redundant. The reason is that the difficulty levels will be so high by this time that it is extremely unlikely that you will be able to cover the costs of your investment. Because new orders may not be delivered until 2014 the only way that it could be profitable ordering a unit from BFL today is if your expectation was that Bitcoin prices were going to skyrocket, in which case you should consider the alternative investment choice which is a direct investment in Bitcoins themselves.

The product pages of the BFL website are fraudulent in that they state information which the directors of butterfly labs knowingly are aware cannot be met. Their product pages state:

"Pre-order Terms: Bitforce SC (ASIC) products are shipped according to placement in the order queue, and delivery may take 2 months or more after order. All sales are final."

The directors of BFL may argue if taken to court that the words "or more" allow them to make deliveries as they wish.  If BFL were taken to court they would lose the argument and a judge would likely decree that they have broken their terms of contract as they have surpassed the expected delivery date and therefore ordered to give a refund and any costs to a customer. In most cases this becomes expensive for small orders other than those living in or nearby the state of Kansas who could take BFL to the Small Claims Court in Kansas City. For large orders where the amount exceeds USD 20,000 it may be cost effective for a court case in a regular court.

Normally a safe course of action would be to use PayPal or a credit card as these institutions generally will refund customers in case of delayed delivery, however because the delay is so long it will be way past the 45 day limit for PayPal and a six-month limit on credit cards. If your credit company will cover purchases for a year then definitely make use of that form of payment.

On the positive side BFL presently is refunding customers who wish to have their money returned. This is expected to continue for the foreseeable future. The reason is quite simple and that is because BFL are taking in tens of millions of dollars in pre-order money which they receive interest-free. They are using part of this pre-order money to buy stock and equipment but the balance they are not using it simply sitting earning high rates of interest to cover future projects. So for them to refund portion of the tens of millions of dollars is not too much of an issue. At present BFL has delivered a certain portion of customers orders or given away free samples in order to obtain goodwill from the press. The early adopters on the forum including some moderators are likely to receive their orders quite soon and may therefore be unlikely to understand the full implication for new customers, although it is hoped they will still be motivated to help everyone including new persons making decisions about Butterfly Labs mining equipment.

The current state of orders can be seen a very helpful website: http://bfl.ptz.ro/

You can check how far BFL is with deliveries if you wish to place a gamble on purchase of equipment from them. Pre-orders started June 2012. At the time of writing only orders to 3rd July 2012 have so far have been shipped.  

There is a current argument on the Bitcoin Forum as to whether BFL should receive a SCAM tag or not. According to the balance of moderators BFL is not a scam and therefore does not get a scam tag, while many people who ordered these almost a year ago believe that they should be given this tag to warn others. BFL conduct business which is borderline illegal as they knowingly mislead customers.  However as for practical purposes this is not proved illegal until a court order is made against them, moderators are therefore erring on the side of caution. Perhaps one should consider that BFL is engaged in sharp practices and is showing an extreme disregard for business ethics. Even the if they don't get a "scam" or "warning" tag, at least newbies should get a warning about them as I hope this posting will serve.
 
The FAQ pages of the BFL website give out vague and obtuse information about delivery:

"Q: Where am I in line and when will my order ship?
A: We currently do not have the ability to easily disclose the number of orders we currently have. Shipping of new units is expected to begin soon. It is unknown at this time when we will complete the shipping of our pre-orders. Even though we should start shipping soon, orders placed now will be shipped at a later time. Our orders date back to June, 2012. All of those orders and those placed since then will be shipped before new orders."

http://www.butterflylabs.com/faq/

To assist new customers, an explanation of difficulty levels may be useful.  The Bitcoin system is based on mathematics and is designed to spread out the production of Bitcoins until 2040. Every 2016 blocks that are mined lead to an change in difficulty levels so that roughly each two weeks there is a new difficulty level.

Unlike the calculators used by the BFL and others which use only one level of difficulty the reality is that they increase dramatically throughout the year. A lot of people have been fooled by this and thought that they were on their way to retirement just by purchasing an order of mining equipment.

Wikipedia explains this stating difficulty is the measure of how difficult it is to find a new block compared to the easiest it can ever be. It is recalculated every 2016 blocks to a value such that the previous 2016 blocks would have been generated in exactly two weeks had everyone been mining at this difficulty. This will yield, on average, one block every ten minutes. As more miners join, the rate of block creation will go up. As the rate of block generation goes up, the difficulty rises to compensate which will push the rate of block creation back down.
 
Here are difficulty levels for the past four months:

Date          Increase %   Difficulty level    

05-Feb   10.33%   3,651,012
18-Feb   11.47%   4,367,876
01-Mar   19.63%   4,847,647
14-Mar   10.98%   6,695,826
24-Mar   38.13%   7,673,000
05-Apr   14.59%   8,974,296
17-Apr   12.28%   10,076,293
30-Apr   12.28%   11,187,257
12-May   11.03%   11,187,257
25-May   8.64%   12,153,412
05-Jun   28.41%   15,605,633

Shown graphically over the last twelve months (courtesy of bitcoin.sipa.be):


As you can see they have been increasing at different rates and frequencies but importantly they are not negative or close to zero.

If we are predicting future difficulty levels we have to take into account both the technology of mining equipment and also Bitcoin prices. There is a very close correlation between difficulty levels and the Bitcoin prices because as Bitcoin prices increase people around the world become interested to mine with graphics cards that they may already have in their computer. The Chinese now account for the greatest increase in Bitcoin users during the last month and there is a propensity for this to continue for some time. In addition to people using graphics cards to mine there are now various companies that are producing specific computer chips for mining use only called ASICs, which operate at about ten times the speed of fast graphic cards.

At present there are various companies producing ASIC chips.  Because of the limited shelf life of equipment using ASIC chips, the companies are now selling chips direct to wholesalers and the lead time is about 100 days. BFL have  a short time ago announced that they will also be selling chips directly to customers and their promised lead time is 100 days.  As BFL is known to make promises they cannot keep it is unlikely that the hundred days will be kept by BFL, however companies like Avalon have proved that they keep to their schedules and so the market will soon be flooded with new mining equipment using these new ASIC chips.

The last difficulty level showed a 28.4% jump in difficulty. If difficulty levels were to continue at an 15% increase each two weeks thereafter the expected future difficulty levels would look as follows:

date     change     difficulty
----------------------------------
05-Jun   28.41%   15,605,633
16-Jun   15.00%   17,946,478
27-Jun   15.00%   20,638,450
08-Jul    15.00%   23,734,217
19-Jul    15.00%   27,294,350
30-Jul    15.00%   31,388,502
10-Aug   15.00%   36,096,777
21-Aug   15.00%   41,511,294
01-Sep    15.00%   47,737,988
12-Sep   15.00%   54,898,686
23-Sep   15.00%   63,133,489
04-Oct   15.00%   72,603,513
15-Oct   15.00%   83,494,040
26-Oct   15.00%   96,018,146
06-Nov   15.00%   110,420,867
17-Nov   15.00%   126,983,997
28-Nov   15.00%   146,031,597
09-Dec   15.00%   167,936,337
20-Dec   15.00%   193,126,787
31-Dec   15.00%   222,095,805

As an example using updated mining data with a Bitcoin price of $125 and the above difficulty levels a BFL Jalapeno rig (5GH/s) customer may break even if received by Mid-Oct.

Here are the same figures using a difficulty level increase of only 10%:

05-Jun   28.41%   15,605,633
16-Jun   10.00%   17,166,196
27-Jun   10.00%   18,882,816
08-Jul    10.00%   20,771,098
19-Jul    10.00%   22,848,207
30-Jul    10.00%   25,133,028
10-Aug   10.00%   27,646,331
21-Aug   10.00%   30,410,964
01-Sep   10.00%   33,452,060
12-Sep   10.00%   36,797,266
23-Sep   10.00%   40,476,993
04-Oct    10.00%   44,524,692
15-Oct   10.00%   48,977,161
26-Oct   10.00%   53,874,878
06-Nov   10.00%   59,262,365
17-Nov   10.00%   65,188,602
28-Nov   10.00%   71,707,462
09-Dec   10.00%   78,878,208
20-Dec   10.00%   86,766,029
31-Dec   10.00%   95,442,632

This shows the risk involved in ordering BFL equipment today. if you think that Bitcoin prices will skyrocket or that for some reason difficulty levels will continue at a low rate of say 10% then you should have no problem if you order equipment from BFL. At a Bitcoin price of $125 and and 10% increase rate of difficulty the breakeven point for BFL equipment is around Mid-Jan 2014.

You can make your own data and see on the many mining calculation websites what you would then for each period. Just don't forget to tap in the increasing difficulty for each two weeks of the time period your calculation.

The reason there is much aggravation amongst early adopters that placed orders for BFL equipment in 2012 is that a 5 GH/s machine would make around $2,000 profit, and a 50 GH/s machine around $20,000 profit, with Bitcoin prices at $120 if started today and mined 24/7 to end 2014, and a hell of a lot more had units shipped when promised.

New customers could be better off to wait and see whether BFL will ever become up-to-date with the deliveries of outstanding orders. If they do a new customers can make more sensible decisions based on the current difficulty levels and this would be an excellent and ideal situation.

New customers can also wait and see if later in the year faster and cheaper chips will be made by other companies like Avalon and ASICMiner in which case they may be able to purchase elsewhere products that consume less energy and will hash away faster at mining Bitcoins.
 
There is an ancient maxim "Caveat Emptor" meaning "Let the buyer beware". This certainly applies to BFL.  Shocked