TIMELINE OF EVENTS:1/24/17 - Initial meeting with solar representative to determine project scope.
2/2/17 - Existing thermal panels relocated to provide optimal site for solar installation.
(click to enlarge)2/3/17 - Site survey performed to gather exact measurements for solar designs.
2/8/17 - Agreement reached with SunPower
® to provide 29 E20 327 watt AC Modules. (
link)
2/10/17 - Engineering design completed. Site plan received.
(click to enlarge)2/20/17 -
YoBit.net sponsorship to provide wind turbine. (
link)
2/22/17 - Solar Installation Application submitted to the electricity company and the home owners association.
3/1/17 - News agency Consolidated Crypto published a story about our Green Energy Project.
3/6/17 - Solar Installation Application approved by home owners association.
3/7/17 - Solar Installation scheduled for March 24th!
3/10/17 - Solar Installation Application approved by electric company.
3/24/17 - Installation of Solar Equipment. City inspection completed/approved.
3/25/17 - Solar Installation has completed! See the drone video of the panels here:
https://www.youtube.com/watch?v=cKisxNn1ueQ3/27/17 - News agency Bitcoin.com has published a story mentioning our Green Energy Project.
4/7/17 - NastyMining Green Energy Project wins 0.7 BTC in Most Appreciated Post contest on the Bitcoin.com forum!
(source: https://forum.bitcoin.com/topic18281.html)4/10/17 - Final documents approved by electric company. Ready for meter set.
4/22/17 - New meters installed. System activated!
4/25/17 - Private online monitoring of statistics enabled.
4/26/17 - Pigeon proofing installed! (installed missed panel on 5/22/17)
5/2/17 - 1.2kW wind turbine & grid tie purchased courtesy of
YoBit.net.
5/25/17 - Thermal panel secondary drain pipe added to resolve issues from relocation. Video:
https://www.youtube.com/watch?v=jBQ2OVXCRR06/6/17 - 1.2kW 48v wind turbine erected.
6/7/17 - Wiring ran to inverter & grid tie installed. First watt of wind energy generated. Video:
https://www.youtube.com/watch?v=REnlKvo27go7/12/17 - Gunbot The Automatic Profit Generator for Kraken, Poloniex, Bittrex has sponsored NastyMining with the purchase of a Tesla Powerwall 2. (
link)
7/13/17 - Order confirmed with Tesla. Pictures and information provided for engineering team.
8/2/17 - Powerwall engineering design completed. Site plan received.
8/7/17 - News agency Cryptoinsider published a story about our Green Energy Project.
10/17/17 - Gunbot The Automatic Profit Generator for Kraken, Poloniex, Bittrex has sponsored NastyMining with the purchase of a SportsArt ECO-POWR™ G510 Indoor Cycle. (
link)
10/30/17 - News agency Newscientist.com published a story mentioning our Green Energy Project.
11/6/17 - Residential Battery Installation Application submitted to the electricity company.
11/22/17 - Residential Battery Installation Application submitted to the city.
2/6/18 - Residential Battery Installation Application approved by electric company.
3/6/18 - Tesla Powerwall 2 Installed!
3/30/18 - Tesla Powerwall 2 passed inspection and is switched on!
11/15/18 - Tesla Powerwall 2 firmware updated to activate energy arbitrage!
3/20/19 - Supports added to Wind Turbine pole for increased stability.
7/01/19 - Inverters replaced on solar panels to increase output and reporting accuracy.