Pages:
Author

Topic: [ANN] JeffColo - 3.5 MW / Miner Hosting / Colocation - West Coast (DC) (Read 12347 times)

newbie
Activity: 2
Merit: 0
Can you host more miner? I send you an email just now
sr. member
Activity: 689
Merit: 253
Hi @sunbreak,

Is there any update on the project? Hasn't heard anything for quiet a while. Anxiously waiting.

Best,
CryptoDance

I'm hoping for an update soon too
newbie
Activity: 5
Merit: 0
Hi @sunbreak,

Is there any update on the project? Hasn't heard anything for quiet a while. Anxiously waiting.

Best,
CryptoDance
newbie
Activity: 5
Merit: 0
Hi guys,

Did anyone get hosted during the last three month? I just got my A3 miners. Mining in California sucks. I reached out to other data centers. Most of them are in Washington obviously. However, they’re super expensive and even that there’s no space available. Any help?

Best,
CryptoDance

sr. member
Activity: 689
Merit: 253
Thanks for the update Jeff! Hadn't heard from you in awhile through email so I had been assuming you were super busy and had greater priorities. Good luck with everything going on!
member
Activity: 107
Merit: 30
I’m “patiently” awaiting an update as well.   Grin

Any update on availability here with Jeffcolo?

I know people have been patiently waiting for an update and I haven't given one in awhile. We have been expediting all of our engineering and plan reviews with a feverish pace. Unfortunately at the same time we also got an early present as Bitmain shipped a significant quantity of miners almost a month earlier than expected. Combined with the holiday season, the last 40 days have been a whirlwind.

Here is the update for everyone following this announcement.

We have 1 MW online at the moment that has validated our adapted modular design for indoor operation. Our electrical engineer has reworked the power distribution design in order to distribute the (48) 200 amp services throughout the building. Additionally we had to hire a civil engineer to work out all the new vault requirements for these new larger than life 1500 kVA transformers. All of this got submitted to local code enforcement for plan review, it passed and we received our permit to start work. Getting this all pulled together going into the holidays was no small feat. All of this information was submitted to the local utility and we are waiting for them to come back with a cost and scheduled installation date for the first transformer.

These modifications shouldn't have been that big of a deal. However we had a benefit with the outdoor version of our module. When considering code enforcement, the outdoor module was considered its own independent structure. Unfortunately when you bring all that power in under one roof there are huge changes that have to be made. I could get started on all the nuances, but it probably deserves it's own book.

Meanwhile we have contracted with a local excavation company that should be starting on the groundwork for the transformer pads and underground conduit maze. All that conduit is going to be quite the spectacle when it's all done and ready to back fill. The excavation company will have the horizontal boring work done to bring the 12 kV primary power to our new vaults.

At the same time we are having our boring work done for the electrical, we will also have boring done for our dark fiber feed into the regional internet exchange. Currently we are using symmetrical gigabit fiber from a local provider as our primary means of connectivity.

Our electrical supplier let us know that the switchgear should be delivered soon and our electrician is ready to go. We found a supplier who indicated they could have the 15,000ft of 300 MCM wire to us within 2 weeks.

While the electrical work is being done we will be having the building exterior modified to accommodate the air flow requirements for both incoming and outgoing air. A dedicated firewalled mechanical room will need to be built for power ingress.

tldr;

The good news is that things are progressing, the bad news is that we were way to optimistic about getting things done over the holidays. We are still at the mercy of the power utilities schedule, so at this time it's impossible to know precisely when things will actually be ready. However I believe all the things I described above should be done in 4-6 weeks from now and hopefully the utility will have us on their schedule for our first transformer install shortly after.

Also, we recently hired help for coordinating with customers. More importantly now than ever please use the '[email protected]' email address and you should get a far faster reply than you would from me.

As you can imagine, we are working hard every day to make this thing a reality.
member
Activity: 115
Merit: 10
I’m “patiently” awaiting an update as well.   Grin

Any update on availability here with Jeffcolo?
sr. member
Activity: 275
Merit: 258
I’m “patiently” awaiting an update as well.   Grin
hero member
Activity: 546
Merit: 500
Any update? I have been waiting since august
sr. member
Activity: 275
Merit: 258
I wanted to update everyone following this announcement on the state of things at the moment.

First and foremost, we did take possession of our new datacenter space on 09/11/2017. We were able to quickly get the first 500 kW service up and running that first week and were busy moving customer gear into it. Starting in October we were able to add an additional service for the second 500 kW service. This was supposed to be the cadence we would continue following until the new year when we planned to have our entire 3 MW available for colocation customers.

Unfortunately there have been delays thrown into the plan by both the local utility and also with our electrical equipment suppliers. The problem with the utility stemmed around our stated load calculations and the utilities lack of belief in them. The utility here has never had to size equipment for a datacenter before and they undersized our service delivery transformers despite our indicated load figures. We were unaware of the sizing problem since the transformers have no significant information located on the exterior.

The first 500 kW service turned out to be running on a 300 kVA transformer which is being upgraded this Friday to a more suitable 500 kVA unit since it was determined that we are severely overloading it to the point of leaking oil.

The second 500 kW service in turn was also on a similar undersized transformer that doesn't seem to match their records. At this point we are unsure what size it actually is and have been instructed to halt adding any additional load until the size can be validated. We have been monitoring the temperature rise of that transformer and found it to be operating well within tolerances. Unfortunately the utility did not agree with our assessment and we will need to wait until Friday to find out what the situation is.

At this point the utility determined the existing plan for power distribution was no longer going to work as our "constant" load was not within their expectations. They wanted to revisit the plan to oversize our transformers and also potentially shorten our timeline to getting a significant amount of capacity online. They proposed that instead of using 6 x 500 kVA transformers as originally planned that instead they would site 3 x 1500 kVA transformers over the next 3 months and limit our usage to no more than 3.5 MW ensuring that we are only ever running the transformers at a maximum of 73% utilization.

That means that as soon as that first 1500 kVA transformer is placed, we would be bringing on an additional 1.15 MW immediately. That could certainly accelerate customer placement. Unfortunately this also means it all has to go back to the electrical and civil engineers to update the design, back to the county for a plan review of the changes and then finally onto the build out schedule at the utility. I have no idea how long this will take, we are trying to expedite it as much as possible.

Unfortunately shifting from 500 kVA to 1500 kVA transformers significantly increases the fault current requirements of down stream equipment. This resulted in some design changes to the type of disconnects and respective fuses. Fortunately it didn't change any of the customer facing switch gear (meters).

The unfortunate part is the update from our electrical supplier on the state of our order for that customer facing switchgear. Apparently due to the events in Texas, Florida and Puerto Rico, electrical equipment has become very high demand and disaster relief areas get first priority. We were given an estimate of approximately 6-8 weeks before we see any of that gear. I really hope it ends up being sooner, but I wouldn't bet on it.

I suspect that the utility changes and respective local government involvement will likely cause a similar delay. We're going to try to make enough progress with the utility so that by the time work begins it will be coordinated fairly closely with the arrival of our long awaited switchgear.

All this means that if you were given an availability date of late October to early November you can expect it now to be closer to late December to early January.



sunbreak, are you still on track for late December to early January on your buildout? I held off on this last batch of S9s and only bought 1 because I didn't have any place to put them. Do you think you will have any hosting space available early next year?  Thanks!
sr. member
Activity: 275
Merit: 258
Definitely following this thread... Need a home for my S9s.  😀
sr. member
Activity: 772
Merit: 261
Hosted my miners with Jeff for long time and I really recommend him, Also have sent miners from Bitmain directly to Jeff which he set them up really fast.
member
Activity: 107
Merit: 30
I wanted to update everyone following this announcement on the state of things at the moment.

First and foremost, we did take possession of our new datacenter space on 09/11/2017. We were able to quickly get the first 500 kW service up and running that first week and were busy moving customer gear into it. Starting in October we were able to add an additional service for the second 500 kW service. This was supposed to be the cadence we would continue following until the new year when we planned to have our entire 3 MW available for colocation customers.

Unfortunately there have been delays thrown into the plan by both the local utility and also with our electrical equipment suppliers. The problem with the utility stemmed around our stated load calculations and the utilities lack of belief in them. The utility here has never had to size equipment for a datacenter before and they undersized our service delivery transformers despite our indicated load figures. We were unaware of the sizing problem since the transformers have no significant information located on the exterior.

The first 500 kW service turned out to be running on a 300 kVA transformer which is being upgraded this Friday to a more suitable 500 kVA unit since it was determined that we are severely overloading it to the point of leaking oil.

The second 500 kW service in turn was also on a similar undersized transformer that doesn't seem to match their records. At this point we are unsure what size it actually is and have been instructed to halt adding any additional load until the size can be validated. We have been monitoring the temperature rise of that transformer and found it to be operating well within tolerances. Unfortunately the utility did not agree with our assessment and we will need to wait until Friday to find out what the situation is.

At this point the utility determined the existing plan for power distribution was no longer going to work as our "constant" load was not within their expectations. They wanted to revisit the plan to oversize our transformers and also potentially shorten our timeline to getting a significant amount of capacity online. They proposed that instead of using 6 x 500 kVA transformers as originally planned that instead they would site 3 x 1500 kVA transformers over the next 3 months and limit our usage to no more than 3.5 MW ensuring that we are only ever running the transformers at a maximum of 73% utilization.

That means that as soon as that first 1500 kVA transformer is placed, we would be bringing on an additional 1.15 MW immediately. That could certainly accelerate customer placement. Unfortunately this also means it all has to go back to the electrical and civil engineers to update the design, back to the county for a plan review of the changes and then finally onto the build out schedule at the utility. I have no idea how long this will take, we are trying to expedite it as much as possible.

Unfortunately shifting from 500 kVA to 1500 kVA transformers significantly increases the fault current requirements of down stream equipment. This resulted in some design changes to the type of disconnects and respective fuses. Fortunately it didn't change any of the customer facing switch gear (meters).

The unfortunate part is the update from our electrical supplier on the state of our order for that customer facing switchgear. Apparently due to the events in Texas, Florida and Puerto Rico, electrical equipment has become very high demand and disaster relief areas get first priority. We were given an estimate of approximately 6-8 weeks before we see any of that gear. I really hope it ends up being sooner, but I wouldn't bet on it.

I suspect that the utility changes and respective local government involvement will likely cause a similar delay. We're going to try to make enough progress with the utility so that by the time work begins it will be coordinated fairly closely with the arrival of our long awaited switchgear.

All this means that if you were given an availability date of late October to early November you can expect it now to be closer to late December to early January.

member
Activity: 107
Merit: 30
List has been updated!
member
Activity: 107
Merit: 30
Terrible service


I would advise anyone looking for a hosting facility to keep away from jeffcolo

Have you ever been a customer? Do you have some experience you would like to share? If you are referring to the delay on email response or pm's? You might have missed the notices I posted about what to expect here;

https://bitcointalksearch.org/topic/m.22218765

and here;

https://bitcointalksearch.org/topic/m.21330284

Sorry we couldn't meet your expectations. I hope you can elaborate more as to how you weren't satisfied.
newbie
Activity: 28
Merit: 0
I have 4 D3s and 2 L3s for which I need space immediately. Please include me in your wait list too.
newbie
Activity: 4
Merit: 0
I might add another 6 antminers (3 d3 & 3 L3+)

Please put me on waiting list.

I really would love to send my antminers to you.
Thanks.
newbie
Activity: 4
Merit: 0
Checking if you have any spot for 100 antminers starting early November...

We wouldn't have room for that based on our waiting list until most likely late December to early January. If you would like I can put you on the waiting list. What type of Antminer are they S9, L3+, D3?


Please...

I have 90 antminers orederd on the way.


​28 L3+  800w
62 D3​  1200w



28    L3+ (Oct 21-31 Batch)   
36    D3   (Oct 15-25 Batch)

19    D3  (Nov 1-15   Batch)   
7      D3  (Nov 21-30 Batch)
member
Activity: 107
Merit: 30
Checking if you have any spot for 100 antminers starting early November...

We wouldn't have room for that based on our waiting list until most likely late December to early January. If you would like I can put you on the waiting list. What type of Antminer are they S9, L3+, D3?
newbie
Activity: 4
Merit: 0
Checking if you have any spot for 100 antminers starting early November...
Pages:
Jump to: