To my understanding those 500 TH/s are intended for sale, or did I get that one wrong?
• Already shipped devices (Gen1, already shipped) were limited by quantity of the power chip supply we pre-ordered before two months.
• We made an order of another brand of power chips which are about two weeks late. In October this will provide another 500TH/s (Gen1).
• If any deal of ordering Gen1 chips from outside buyers via us is reached, additional orders will be made.
• The size of the Gen2 order will be decided as appropriate, according to the network difficulty when it is time to finalize the order size.
Yes, mainly sale, some for franchising. We know internal hashing power is limited to 47TH/s. Although, there is some capacity at new datacenter, but who knows when it will be ready to use.