Pages:
Author

Topic: MegaBigPower.com - Managed Hosted Mining (Read 7991 times)

legendary
Activity: 1946
Merit: 1006
Bitcoin / Crypto mining Hardware.
November 18, 2013, 01:49:02 AM
#46
I donot see the January reels anymore. The pricing was right on that one, ~$5 a pop.
newbie
Activity: 4
Merit: 0
November 18, 2013, 01:20:42 AM
#45
do you have chips now?
hero member
Activity: 756
Merit: 522
February 02, 2013, 03:12:57 AM
#44
I'm happy to announce my involvement with the 100TH Mine project, as hosting provider of choice!  This is a great project - BitFury has the design doing simulations already and the project is on track for mining in the June/July timeframe.  What I like about it is the price point - at $5/GHs, it amounts to 200GH/s for the same $1000.  I think its a worthy place to put your hardware dollars, especially if you got aced out of bASIC, BFL or Avalon.

For those of you who haven't checked out BitFury's FPGA project: http://www.bitfury.org/bitfury110.html

One thing to make very clear: this is not a reborn bASIC project, does not use Tom's chips, is not related in ANY way to bASIC.


https://bitcointalksearch.org/topic/picostocks-100ths-bitcoin-mine-100th-140366

Not related in any way other than, of course, you.
sr. member
Activity: 462
Merit: 250
February 01, 2013, 08:28:06 AM
#43
I'm happy to announce my involvement with the 100TH Mine project, as hosting provider of choice!  This is a great project - BitFury has the design doing simulations already and the project is on track for mining in the June/July timeframe.  What I like about it is the price point - at $5/GHs, it amounts to 200GH/s for the same $1000.  I think its a worthy place to put your hardware dollars, especially if you got aced out of bASIC, BFL or Avalon.

For those of you who haven't checked out BitFury's FPGA project: http://www.bitfury.org/bitfury110.html

One thing to make very clear: this is not a reborn bASIC project, does not use Tom's chips, is not related in ANY way to bASIC.


https://bitcointalksearch.org/topic/picostocks-100ths-bitcoin-mine-100th-140366




LOL what a joke that is. Good luck Dave, you need it.


Hint: STOP FCKING INVOLVED WITH PONZI SCHEME AND SCAMMERS... unless you're a scammer as well. In my eyes, to the last minute you still vowed for Tom is enough to say you're not better than a scammer.
vip
Activity: 472
Merit: 250
January 31, 2013, 07:35:33 PM
#42
I'm happy to announce my involvement with the 100TH Mine project, as hosting provider of choice!  This is a great project - BitFury has the design doing simulations already and the project is on track for mining in the June/July timeframe.  What I like about it is the price point - at $5/GHs, it amounts to 200GH/s for the same $1000.  I think its a worthy place to put your hardware dollars, especially if you got aced out of bASIC, BFL or Avalon.

For those of you who haven't checked out BitFury's FPGA project: http://www.bitfury.org/bitfury110.html

One thing to make very clear: this is not a reborn bASIC project, does not use Tom's chips, is not related in ANY way to bASIC.


https://bitcointalksearch.org/topic/picostocks-100ths-bitcoin-mine-100th-140366


member
Activity: 74
Merit: 10
January 28, 2013, 08:26:56 PM
#41
I already own a 12000 sqft warehouse with 60 Tons of cooling and it would still take me 100K to pull something like this off.  I don't see how you can possibly make your money back.
Sounds like you know what you are talking about - please elaborate, I'd love to validate my numbers.

It sounds like you don't know what you're talking about.

I don't think you have any more understanding of clustered computing or infrastructure than your intended market demographic.

/thread
full member
Activity: 196
Merit: 100
January 27, 2013, 06:46:58 AM
#40
lol, I guess this idea is shot down now since btcfpga will not be delivering products at all.

He's hosting devices from any manufacturer.
sr. member
Activity: 462
Merit: 250
January 26, 2013, 10:56:26 AM
#39
lol, I guess this idea is shot down now since btcfpga will not be delivering products at all.
legendary
Activity: 1274
Merit: 1004
January 23, 2013, 10:28:00 AM
#38
IMHO it is a complete waste of money and time to set up redundant power for a mining operation. I mean do the math, people.

A miner shouldn't care if he is down 1 day every year due to power outages. That's only a downtime of 0.27% therefore a 0.27% loss of your yearly mining profits... This is not like a high-traffic e-commerce website where a downtime of 1 day during the christmas season would cost you a bigger percentage of your revenues.

So, let's do the math, since math is fun. Even if BTC price were $20 and Dave hosted a full 5% of the network, a full 24 hour day of power outage would cost miners $3600. With a more reasonable 2% of the network hosted, even at $25/BTC a full day of downtime would only be a cost of $1800.

At 2% of the network and $25/BTC, you could be without power for one week a year and it would only cost you $12,600. That's not chump change, but you'd need a lot of downtime to justify the generator. That's without even looking into how profitable running the generator is. You pay low rates for power, but a diesel generator is considerably more expensive per kWh to run. Even if the generator was free, you might want to look into what the costs are for providing the backup power and whether it would just be cheaper to buy coins to compensate for lost revenue. You might find you're close to break even on diesel power once the network catches up to ASICs.

Edit: Not exactly the world's greatest source, but I'm sitting in a waiting room and research on a phone sucks. Wikipedia says a modern diesel genset will consume about 0.28-0.4 litres/kWh, so say 0.08 US gallons (0.3l) per kWh. At an average of US$4/gallon, your cost just in fuel to run on the generator would be $0.32/kWh.
mrb
legendary
Activity: 1512
Merit: 1028
January 22, 2013, 10:40:47 PM
#37
IMHO it is a complete waste of money and time to set up redundant power for a mining operation. I mean do the math, people.

A miner shouldn't care if he is down 1 day every year due to power outages. That's only a downtime of 0.27% therefore a 0.27% loss of your yearly mining profits... This is not like a high-traffic e-commerce website where a downtime of 1 day during the christmas season would cost you a bigger percentage of your revenues.
legendary
Activity: 966
Merit: 1000
January 22, 2013, 04:07:16 PM
#36
To do it right, you ought to have:
 * Redundant internet connections to 2 or 3 different providers, ideally each using a different technology (cable, DSL, and fiber for instance).  These should be business-class managed connections with SLAs.  The kind where they call you when it goes down, usually within a minute.
 * Redundant cooling.  2 separate air conditioning systems, each one able to manage the full cooling load on its own, even on a hot day.  Plan for room to grow.
 * Redundant power feeds.  Connections to 2 different power providers.
 * Redundant standby generators, each one able to manage the full load of the equipment *and the cooling* and everything else on its own.  I would use 2 diverse fuel types, probably one Diesel and one propane/nat gas.  The gensets should be periodically tested, and of course maintained.  Plan for room to grow.
 * A UPS to condition the power, and keep everything from rebooting when grid power fails and the genset is still starting up.  It's OK if the air conditioning is not UPS-backed.

You'll need a lot of other things too, but those are some big ones.

You'll need a lot of interior wiring and load centers and such for power distribution.  If I were you I'd try and use 240V circuits to power everything whose power supply can accept it, for efficiency's sake.  Having the ability to remotely and/or programmatically power-cycle the circuits/outlets would be nice to have too.

You yourself should be redundant.  You should have a trusted partner who has full access and can do everything you can, in case something needs to be done and you're unavailable.

Thanks Bogart - great suggestions here.  I'll be honest - some of this redundancy fits my business plan, but not all of it.  For example getting redundant power feeds at upwards of 800A service is not in the cards - I don't think there's even another power provider in this city.  I plan to have one power service and one backup generator - but getting a backup generator that can supply full load is also going to be a trick.

For 200kW you'll probably be looking at 6-cyl turbocharged Diesels with liquid cooling.  Dry weight will be 1.5-2.5 tons.  I'd expect to pay at least $20k for a used one.

A transfer switch for that kind of load won't be cheap either.
vip
Activity: 472
Merit: 250
January 22, 2013, 03:08:13 PM
#35
To do it right, you ought to have:
 * Redundant internet connections to 2 or 3 different providers, ideally each using a different technology (cable, DSL, and fiber for instance).  These should be business-class managed connections with SLAs.  The kind where they call you when it goes down, usually within a minute.
 * Redundant cooling.  2 separate air conditioning systems, each one able to manage the full cooling load on its own, even on a hot day.  Plan for room to grow.
 * Redundant power feeds.  Connections to 2 different power providers.
 * Redundant standby generators, each one able to manage the full load of the equipment *and the cooling* and everything else on its own.  I would use 2 diverse fuel types, probably one Diesel and one propane/nat gas.  The gensets should be periodically tested, and of course maintained.  Plan for room to grow.
 * A UPS to condition the power, and keep everything from rebooting when grid power fails and the genset is still starting up.  It's OK if the air conditioning is not UPS-backed.

You'll need a lot of other things too, but those are some big ones.

You'll need a lot of interior wiring and load centers and such for power distribution.  If I were you I'd try and use 240V circuits to power everything whose power supply can accept it, for efficiency's sake.  Having the ability to remotely and/or programmatically power-cycle the circuits/outlets would be nice to have too.

You yourself should be redundant.  You should have a trusted partner who has full access and can do everything you can, in case something needs to be done and you're unavailable.

Thanks Bogart - great suggestions here.  I'll be honest - some of this redundancy fits my business plan, but not all of it.  For example getting redundant power feeds at upwards of 800A service is not in the cards - I don't think there's even another power provider in this city.  I plan to have one power service and one backup generator - but getting a backup generator that can supply full load is also going to be a trick. 

hero member
Activity: 697
Merit: 500
January 21, 2013, 05:32:11 PM
#34
I'm curious if Washington has low enough summer ambient temperatures such that you could filter outside air for particulates and use it as your cold-air. It looks like Seattle averages highs in the 70s during the summer. Drop your average electricity costs at the risk of having to throttle back during June and July. Would be a neat solution.
hero member
Activity: 518
Merit: 500
January 21, 2013, 12:20:10 AM
#33
It's under 3 cents a kw in my county. I've considered doing the same thing, but without renting a large facility with proper cooling its unrealistic. Doing it on a small scale would be easy enough though, once you have to rent something to house excess units it would take a whole lot to cover rental costs. If we never moved away from using gpu's a lot of people would do this kind of thing.
legendary
Activity: 2128
Merit: 1073
January 20, 2013, 07:57:29 PM
#32
In the GPU mining threads many people have shown that the way to get best hash/dollar is not by esotheric cooling but by underclocking and undervolting to meet the available thermal budget.

So again, marketing to the OCD and newbie crowds.

Oh, on by the way: BlackBox is a recognized brand name with long history in marketing network stuff to newbies. So anyone who feels themselves persuaded by their glossy marketing collateral should maybe adjust their self-awareness appropriately. I'm not going to generally diss BlackBox, because their marketing materials are top notch and may serve as an usefull reference for "maximum non-insane prices".
legendary
Activity: 966
Merit: 1000
legendary
Activity: 966
Merit: 1000
January 20, 2013, 07:21:12 PM
#30
* A UPS to condition the power, and keep everything from rebooting when grid power fails and the genset is still starting up.   It's OK if the air conditioning is not UPS-backed.
What's the value proposition of that requirement? To me it looks like something to attract obsesive-compulsive nutbags or completely clueless newbies.


Mostly in the conditioning of the power.  I suppose for mining it's not really a big deal if things reboot, though I imagine a select few critical systems ought to still be UPS'd.
legendary
Activity: 1890
Merit: 1003
legendary
Activity: 2128
Merit: 1073
January 20, 2013, 07:03:31 PM
#28
* A UPS to condition the power, and keep everything from rebooting when grid power fails and the genset is still starting up.   It's OK if the air conditioning is not UPS-backed.
What's the value proposition of that requirement? To me it looks like something to attract obsesive-compulsive nutbags or completely clueless newbies.
hero member
Activity: 868
Merit: 1000
January 20, 2013, 06:48:41 PM
#27
It would probably be helpful if you stated which recognised data centre security standards you intend meeting.  It's obviously not realistic to expect that you could offer the same level of security as facilities such as those used by financial service providers or that you need to do so.  It's going to be cheaper to cover some risks via insurance.
Pages:
Jump to: