Hash the Planet
http://hashthepla.net/#section-pricingLocated at a property owned by Jay Byers, owner of the 106,000-square-foot Mission District building in Cashmere who has been leasing 13,000-square feet of space to a server farm business for the past 18 months.
https://www.chelanpud.org/docs/default-source/commission/forum-lets-high-density-power-users-share-their-side-of-the-story---leavenworth-echo-jan-27-2016.pdf?sfvrsn=0It does not mention the total capacity but it does mention the total investment of $800k going on $1M, so I would assume no less than 1 MW and probably no more than 2 MW.
http://hashthepla.net/gallery/#!
Looks like they are selling on eBay right now ...
http://www.ebay.com/itm/281899529175The listing says "We have hundreds and hundreds and hundreds". So I would assume no less than 300 and probably no more than maybe 1000. Assuming this isn't the only equipment the power need of 180 kW - 600 kW. Since that lines up with the original projection above I would assume it's a 1 MW datacenter. However spending $800k - $1 M on the setup in the picture of the Hash the Planet pics leads me to think they have a lot more power they aren't using.
In the above Chelan PUD document the building owner Jim Byers mentions ""I made the agreement with these guys that I would build the server system and in two years they will buy it for $3 million more than he put into it. So far, I'm $800,000 into this thing and will be $1 million into it before its done. I own the server system and they run the computers," he said. "They told me if the rate goes up, they will just move. I will lose $4 million if you do this."
So it sounds like he bought a bunch of miners. Man .. what did S5's go for ... $340-$420 ... If you spent $1 million on build out and another $3 million on S5's that would get you approximately 7000 S5's and psu's .... That would use 590 watts x 7000 miners = 4.1 MW. Which is still within the 5 MW Chelan PUD limit for subsidized power rates.
Although in that "High Density Load Forum with Chelan County PUD and Salcido Connection Wenatchee WA" video I posted earlier which is from just a couple days ago. It is stated several times the "actual amount of power being used currently in Chelan PUD is just over 5 MW" and that perhaps there "were" previously failed endeavors accounting for several other MW that may no longer be utilized for mining.
https://www.youtube.com/watch?v=mUPLp_AVIWY"
So if you take that as absolute truth then the following operations cannot account for more than "just over 5 MW" of active capacity. Malachi claims he is using 3.7MW of that figure leaving 1.3 - 1.6MW to account for the other two.
Dedicated ASIC Services - Michael Cao / Cashmere, could be ZoomHash who claims to have 3MW
http://zoomhash.com/pages/hostingSalcido Connection - Malachi Salcido / Cashmere, South Wenatchee
Hash the Planet - Sean Cooper / Cashmere
Oh ... cool I just confirmed the location of the second Salcido connection site.
"At last Wednesday's forum Salcido Connection owner Malachi Salcido, who has equipped much of the former Tree Top facility in Cashmere as a low tier no tier data center and is working on a second facility in the Go USA building in Wenatchee"
http://cashmerevalleyrecord.com/print.asp?ArticleID=9072&SectionID=5&SubSectionID=5So that confirms it is the building on the right.
https://www.google.com/maps/place/GO+USA,+Inc/@47.4179256,-120.3044442,3a,75y,328.03h,90.39t/data=