Pages:
Author

Topic: Pics of Huge Hosting Mine Under Construction, (Dec 2015 Update: We've moved) - page 19. (Read 54181 times)

hero member
Activity: 728
Merit: 500
The updates are awesome.  I'll be interested in seeing more pics for sure as the finishing touches are made.

Are there any plans to allow tours for the hardcore interested?  I visit family up there quite often and would view an opportunity like I did when I visited the BTC ATM installed near me (Mountain View, Ca) - Completely unspectacular but awesome as hell.

I'm not dedicated to the notion...; )
full member
Activity: 121
Merit: 100
Feel free to contact me via email, skype or phone!
The power!! You gonna try power factor correction?  Curious to if a mine runs a capacitive power factor.

We don't accept miners which don't have power factor correction in their PSUs.
legendary
Activity: 1722
Merit: 1000
The power!! You gonna try power factor correction?  Curious to if a mine runs a capacitive power factor.
full member
Activity: 121
Merit: 100
Feel free to contact me via email, skype or phone!
Installing transformers now.
We have eight of them.
Check it out:

legendary
Activity: 1401
Merit: 1008
northern exposure
lol. those pictures looks great man, gz about it!!!

Which mining company is powering the farm??

yeah i want to know it too

Btw diff will grow up soon, as i suspect Tongue
full member
Activity: 121
Merit: 100
Feel free to contact me via email, skype or phone!
I'm not quite sure what you're asking - but I'm interested.

Have you considered purchasing a miner like the antminer s4 which has a PSU included and shipping it directly to our facility?

Sorta like a group buy. You buy a pallet of miners, then sell them individually for a small markup. Both Spondoolies and Bitmain have bulk orders for sale. I know I'd pay a little extra to know you already have it in stock and can fire it up immediately.

That sounds like a cool idea. If someone wanted to partner with us, they could send us a pallet, then resell them at a markup, I'd be happy to transfer ownership of the miners to the buyer.
legendary
Activity: 3878
Merit: 1193
I'm not quite sure what you're asking - but I'm interested.

Have you considered purchasing a miner like the antminer s4 which has a PSU included and shipping it directly to our facility?

Sorta like a group buy. You buy a pallet of miners, then sell them individually for a small markup. Both Spondoolies and Bitmain have bulk orders for sale. I know I'd pay a little extra to know you already have it in stock and can fire it up immediately.
legendary
Activity: 1036
Merit: 1005
Yeah something like that, but it'd be even easier if you can care about all that logistics
and just quote some total price. Than I can pay you X $ and have an s4 (or
whatever) running from jan 1st without messing with the antminer shop, having the UPS guy
call me when he cant find your factory, all that stuff..
Probably that's asked too much and you're not interested in retailing miners, though..
Edit: Even better would be the spondoolies 15xsp20 pack, but they ship without psu..
full member
Activity: 121
Merit: 100
Feel free to contact me via email, skype or phone!
Hi asicspace,
I'm from europe so it's quite a hassle for me to organize miners, suitable psu's and probably accesories etc to be shipped to your place. Do you plan to offer all-inclusive packs, which contain one unit of a popular
miner model and, say, 12 months electricity? After that, the customer can decide to have it shipped
home, put to garbage etc. That would be really interesting for me.

I'm not quite sure what you're asking - but I'm interested.

Have you considered purchasing a miner like the antminer s4 which has a PSU included and shipping it directly to our facility?
legendary
Activity: 1036
Merit: 1005
Hi asicspace,
I'm from europe so it's quite a hassle for me to organize miners, suitable psu's and probably accesories etc to be shipped to your place. Do you plan to offer all-inclusive packs, which contain one unit of a popular
miner model and, say, 12 months electricity? After that, the customer can decide to have it shipped
home, put to garbage etc. That would be really interesting for me.
legendary
Activity: 1045
Merit: 1000
pretty empty.

how mw ventilation do you use for how much mw mining gears?
sr. member
Activity: 335
Merit: 250

tl;dr: I agree with your thoughts, but it isn't necessary as others are on the hook to ensure temps are appropriate, and plans are in place.

Yeah I figured cost effective measures and timeline were the constraining factors Smiley lol aren't they always Smiley  You're right, in that you have plenty of time before the external temps (I think the worry starts around july).  There will be some low hanging fruit you can do as the heat encroaches.  Those metal doors would be priority to seal and insulate, that would be my first target in the coming months.  Running Insulation to the thermocline (heat/cool barrier, should be somewhere around the dark line on the concrete in your latest photo slightly above where the cool air outputs are located.  Both easy and cost effective solutions. 

Also an added bonus, those overhead, what I assume are wire runs, frames would work well for dropping vents above cold aisles if thermal turbulence prevents airflow.  Shouldn't be an overly expensive solution, if you find it necessary later.

I would suggest buying a bunch of cheap digital thermometers, if you don't already have a more sophisticated solution.  1 per rack section and a clipboard patrols/recording (I love low tech solutions) should let you moderately trouble shoot your arrangement.

Great timing on hitting this in the winter Smiley It will give you plenty of time to observe heat distribution while you still have plenty of cooling bandwidth before summer.  I hope some of this is useful for you and wish you the best of luck.  If you ever want to bounce ideas, just send me a PM.  I love this stuff.  Keep up the good work.
newbie
Activity: 26
Merit: 0
Here is an idea for you, in this video check out how our data center Cold Isle setup is done at economic cost..  We use standard clear acoustic ceiling tiles to contain the cold air from the raised floor and distribute hot air up high to be drawn in by two liebert downdraft 30 Ton AC Units.

http://www.mystarpoint.com/datacenter/

What do you think?
full member
Activity: 121
Merit: 100
Feel free to contact me via email, skype or phone!
Hey, I climbed up a ladder and took this pic. Nice angle, eh?

full member
Activity: 121
Merit: 100
Feel free to contact me via email, skype or phone!
legendary
Activity: 1722
Merit: 1000
5000 AMP SWITCH gear you boys are serious.  480VAC.. 600VAC is where it is at!! GO CANADA!! lmao. 

Thanks for the pics looks good!!
full member
Activity: 121
Merit: 100
Feel free to contact me via email, skype or phone!
Please tell me you have looked into insurance, just incase, if so was it hard to get insurance?
Your putting alot of hard work and money into his and i wouldn't want to see it go up in smoke like the mining facility in Thailand.
These guys had NO insurance!
http://www.coindesk.com/gallery-fire-destroys-thai-bitcoin-mining-facility/

Yes we have coverage for fire, theft, and electric surges for the full market value of all our customer's equipment in the data center. We're insured through Farmers.
legendary
Activity: 1638
Merit: 1010
https://www.bitcoin.com/
Please tell me you have looked into insurance, just incase, if so was it hard to get insurance?
Your putting alot of hard work and money into his and i wouldn't want to see it go up in smoke like the mining facility in Thailand.
These guys had NO insurance!
http://www.coindesk.com/gallery-fire-destroys-thai-bitcoin-mining-facility/
full member
Activity: 121
Merit: 100
Feel free to contact me via email, skype or phone!
sr. member
Activity: 335
Merit: 250
No raised flooring? cold air from above?  

Do vents all line the exterior walls?  Just judging from the garage door, is the cold air entering from ~15-20 ft.?

are you doing hot aisle/cold aisle?

Was this building custom built?

or re-purposed with warehouse racks?

The high ceiling are nice, assuming the cooling intake is all the way up on the ceiling.

We are doing hot/cold aisle. Our engineers assure us the high ceilings and concrete will do a lot of the work dissapating the heat for us.

so I assume then the venting on the side is an attempt to use force airflow for cooling.  Each pass over a hot aisle will dilute the cooling to the center most rows.  In essence you'll be fighting thermal dynamics and having to over cool (and waste much more energy) attempting to reduce hot spots in the center.  Higher hardware failures and reduced performance (some hardware will under-clock itself to reduce temp) in the center of the center aisle (or other areas, depending on how the forced flow venting is positioned).  While concrete does have decent thermal conductivity, unless the air you are pumping is warmer than the external temperature, it will actually warm the air coming from the wall adjacent venting (see 4th photo on your initial post). Essentially your venting will be cooling the wall first, then the equipment. Furthermore, the first hot aisle will create thermal turbulence in cooling airflow, thus giving inconsistent results to your cooling attempts.  This is why most data centers have moved toward something like what's in this simple image:



now I'm not trying to troll or dig on you, more so trying to give potential improvements, but this would be an issue better dealt with prior to having hardware on the racks which will only create migration complexity in the future.  The user experience to watch out for, if this is the going forward scenario, is constant complaints of "I have 4 identical units with 1 (located in a possible hot spot) that consistently under performs."

Also, another consideration, when in a heterogeneous hardware situation (I assume you'll be hosting many different brands) and user controlled overclocking your thermal zones will be in constant flux.  I just feel concern that this will create the dreaded whack-a-hot-spot situation many early data centers  experienced.  Without a view of your actual cooling plan, I can only go by what I see in the photo.

Take some pictures of the Cooling planned.  Grin

I too would love to see these.

Edit: Great resource if your looking to leverage some free advise  http://hightech.lbl.gov/datacenters.html
Pages:
Jump to: