Zcash difficulty took a pretty big drop today. No clue why but I’m going to enjoy it while it’s here.
legendary
Activity: 4256
Merit: 8551
'The right to privacy matters'
Interesting read:

Bank Of Canada: PROOF-OF-WORK BEATS ALTERNATIVE CONSENSUS SYSTEMS

https://bitcoinist.com/bank-canada-proof-work-security/

Yep

BTC and LTC  are asic secured  and need serious money  to  own enough  to 51%  mine it.
This has always been my argument against pos.


MY twist on gpu mined coins  is the need  3 ready_made forks to be secure against a 51%  attack
they also need  their own algo and all 3 forks  waiting.


right now  we have 43,432,079,575 gh   for sha 256  based BTC maybe  really  50,000,000,000 gh

and we can divide by 14,000   or 3,571,428  s9's   that is secure    and hard to overcome
may cost 1,785,714,285  and 215,000,000 or 2,000,000,000  in gear to attempt  to attack BTC with a 51%


LTC is 305,534 gh or 610,000   L3+  at 300 each 183,000,000  add 17,000,000 total 200,000,000  to attack at 51%

so both LTC and BTC  are protected  by  $$$ in gear

BTC  more then 2 billion is needed to attack with 51%  also  the net worth of the coin is 143 billion

LTC more then  200 million is needed to attack with 51% the net worth is 5 billion










on the  new pangolin  I may will  get a demo  to do  some you tube videos

 https://bitcointalksearch.org/topic/m.42861780
legendary
Activity: 1498
Merit: 1030

Hmm they use 16nm finfet, not 7 or 10nm, yet achieved efficiency exceeding GMO or INNO's 7/10nm miner. Are they legit?

If they're using one of the more recent upgrade process versions, it's possible.
They DO have a legit 28nm miner with efficiency that could argue with the Spondoolies SP20.

Also, NOBODY has 7nm or 10nm in production for a miner yet - eBang will probably be the first given announced plans, unless Bitmain or Inno switch to using Samsung for a fab.
hero member
Activity: 1151
Merit: 528
With my new job I've pretty much put my farm on full auto thanks to AwesomeMiner. Have all my rigs benched/groups appropriately and let AM profit switch to whatever YIMP pool is the most profitable and I'm taking the BTC payout. According to my graphs I'm doing just fine.. sure profits are low but my power is covered, loans are covered, and I can buy toys for the farm and write them off as business expenses!
newbie
Activity: 42
Merit: 0
Some people have reported making a killing on it, especially in our current market Huh
jr. member
Activity: 85
Merit: 6
Interesting read:

Bank Of Canada: PROOF-OF-WORK BEATS ALTERNATIVE CONSENSUS SYSTEMS

https://bitcoinist.com/bank-canada-proof-work-security/
legendary
Activity: 4256
Merit: 8551
'The right to privacy matters'
for now I have been buying s9i's at under 550 from bitmain  and sitting on them

pangolin  is now touting a 33th 2150 watt  machine  that is under 0.066 watts a gh  the best claimed by anyone.


I would have preferred it to be 20 th  and do 1320 watts.

But here is a link

https://pangolinminer.com/557-2/

1999 for it  due sept 20th

Hmm they use 16nm finfet, not 7 or 10nm, yet achieved efficiency exceeding GMO or INNO's 7/10nm miner. Are they legit?

the m3 was real

https://bitcointalksearch.org/topic/reviewguide-whatsminer-m3-115-ths-2000w-bitcoin-sha-256-asic-miner-2390138


Original post by philipma1957, posted in November 14, 2017:
these are raw shot videos today no editing. this is intentional as transparency is a desired detail


first  video will be live at:


https://youtu.be/fpHAYR1PjA8

 https://youtu.be/zdIjX0cd9d4

https://youtu.be/_ppH5xHkrV4



Should you buy this

yes if you have a place for the sound it is really loud
yes if you have low cost power
yes if it ships quickly------- I got the demo fast

unboxing

Your video will be live at: https://youtu.be/CJaKc-2Isdk


It has been moved to the solar array


I sold it during the big runup in december

I shot HagssFIN a pm about it today.
sr. member
Activity: 610
Merit: 265
for now I have been buying s9i's at under 550 from bitmain  and sitting on them

pangolin  is now touting a 33th 2150 watt  machine  that is under 0.066 watts a gh  the best claimed by anyone.


I would have preferred it to be 20 th  and do 1320 watts.

But here is a link

https://pangolinminer.com/557-2/

1999 for it  due sept 20th

Hmm they use 16nm finfet, not 7 or 10nm, yet achieved efficiency exceeding GMO or INNO's 7/10nm miner. Are they legit?
full member
Activity: 1148
Merit: 132
for now I have been buying s9i's at under 550 from bitmain  and sitting on them

pangolin  is now touting a 33th 2150 watt  machine  that is under 0.066 watts a gh  the best claimed by anyone.


I would have preferred it to be 20 th  and do 1320 watts.

But here is a link

https://pangolinminer.com/557-2/

1999 for it  due sept 20th

Those are good numbers but serms to me btc mining has never been more unprofitable now than its ever bern
im sitting on six s9s I bought last year, 14th units , I couldn’t even sell them with bitmain dumping thier T1s and 9is

I don’t think ill ever buy another asic, unless baikal comes out with like an x16 or lyra miner
legendary
Activity: 4256
Merit: 8551
'The right to privacy matters'
for now I have been buying s9i's at under 550 from bitmain  and sitting on them

pangolin  is now touting a 33th 2150 watt  machine  that is under 0.066 watts a gh  the best claimed by anyone.


I would have preferred it to be 20 th  and do 1320 watts.

But here is a link

https://pangolinminer.com/557-2/

1999 for it  due sept 20th
sr. member
Activity: 610
Merit: 265
Can confirm. In Malaysia it takes 2 months just to pull 250A 3 phase power in. Meanwhile you gotta make do with the default 63A 3 phase.
legendary
Activity: 4256
Merit: 8551
'The right to privacy matters'
...
A 25 kVA transformer can only do about 105A (and peak loads up to about 140A or so @ 240V).  Around my parts most homes with 200A service have a 15 kVA transformer, and large homes have a 25 kVA transformer.  Really large residential homes have a 50 kVA transformer.  A large 50 kVA is still only able to deliver 210A or so on a 24/7 basis.  And once you get much past that, the 350 MCM Al wire running between the transformer and your meter base begins to become the limiting factor.

Technically correct, but transformer power ratings are more of a moving target rather than a fixed number because as long as the core is sized properly for the voltage swing and frequency the power throughput is entirely dependent on the temperature rise of the windings. Taken to the extreme, that means a nearly infinite amount of power can flow through a transformer if the windings are superconductors. I know it sounds crazy, and using superconductors for windings isn't exactly practical, but it's true.

Even with humble copper windings most utility distribution transformers are immersed in oil for cooling so they can take a high degree of overload for surprisingly long periods of time, particularly if the ambient temperature is well below 25-35C. Hell, one cheap way that utility companies can instantly increase a transformer's power rating is to slap some fans on it; good for at least a 25% bump in continuous load rating, as long as the higher voltage drop is permissible.

When I started consuming above 20,000 watts 24/7, I had the power company come out and swap my 25 kVA for a 50 kVA one.  There was no cost to me.  Where I live in rural Virginia, nothing needs to be filed or justified with the county, it is all just between me and the POCO.  I just called them up one day, and 20 minutes later an engineer was at my door step and I showed my power usage and he said yep, let's swap in a 50 kVA for you.

The willingness of the utility company to upgrade your distribution transformer very much depends on the particular company and municipality (and, of course, how much average power you have drawn or are projected to draw). In my neck of the woods you practically have to set the pig on fire before the utility will replace it for free, and while they will gladly upgrade it if you pay them to do so, that can take weeks for the paperwork or whatever to work its way through the various bureaucracies.


  this is pretty much to case with  us.
full member
Activity: 420
Merit: 184
...
A 25 kVA transformer can only do about 105A (and peak loads up to about 140A or so @ 240V).  Around my parts most homes with 200A service have a 15 kVA transformer, and large homes have a 25 kVA transformer.  Really large residential homes have a 50 kVA transformer.  A large 50 kVA is still only able to deliver 210A or so on a 24/7 basis.  And once you get much past that, the 350 MCM Al wire running between the transformer and your meter base begins to become the limiting factor.

Technically correct, but transformer power ratings are more of a moving target rather than a fixed number because as long as the core is sized properly for the voltage swing and frequency the power throughput is entirely dependent on the temperature rise of the windings. Taken to the extreme, that means a nearly infinite amount of power can flow through a transformer if the windings are superconductors. I know it sounds crazy, and using superconductors for windings isn't exactly practical, but it's true.

Even with humble copper windings most utility distribution transformers are immersed in oil for cooling so they can take a high degree of overload for surprisingly long periods of time, particularly if the ambient temperature is well below 25-35C. Hell, one cheap way that utility companies can instantly increase a transformer's power rating is to slap some fans on it; good for at least a 25% bump in continuous load rating, as long as the higher voltage drop is permissible.

When I started consuming above 20,000 watts 24/7, I had the power company come out and swap my 25 kVA for a 50 kVA one.  There was no cost to me.  Where I live in rural Virginia, nothing needs to be filed or justified with the county, it is all just between me and the POCO.  I just called them up one day, and 20 minutes later an engineer was at my door step and I showed my power usage and he said yep, let's swap in a 50 kVA for you.

The willingness of the utility company to upgrade your distribution transformer very much depends on the particular company and municipality (and, of course, how much average power you have drawn or are projected to draw). In my neck of the woods you practically have to set the pig on fire before the utility will replace it for free, and while they will gladly upgrade it if you pay them to do so, that can take weeks for the paperwork or whatever to work its way through the various bureaucracies.

full member
Activity: 1148
Merit: 132
I used to have a single 25 kVA pole mounted transformer feeding a 320A meter base at the house, which in turn had 2x 200A panels behind it, and a 400A meter base at my shop with a single 200A panel behind it.  The 320A meter base was feed via 350 MCM Al and the shop meter base was feed via 500 MCM Al.  350 MCM Al is rated for 280A and 500 MCM Al is rated for 350A.  This is at 90C btw, which the power company is allowed to use.

A 25 kVA transformer can only do about 105A (and peak loads up to about 140A or so @ 240V).  Around my parts most homes with 200A service have a 15 kVA transformer, and large homes have a 25 kVA transformer.  Really large residential homes have a 50 kVA transformer.  A large 50 kVA is still only able to deliver 210A or so on a 24/7 basis.  And once you get much past that, the 350 MCM Al wire running between the transformer and your meter base begins to become the limiting factor.

When I started consuming above 20,000 watts 24/7, I had the power company come out and swap my 25 kVA for a 50 kVA one.  There was no cost to me.  Where I live in rural Virginia, nothing needs to be filed or justified with the county, it is all just between me and the POCO.  I just called them up one day, and 20 minutes later an engineer was at my door step and I showed my power usage and he said yep, let's swap in a 50 kVA for you.

For residential service, POCO always size based on peak loads, so having dual 400A services from a single 25 kVA is ok, as based on their experience, they never see a residential customer coming even close to pushing the continuous rating of a 25 kVA transformer.

strange way to spec a system lol, I pull 20k from my house and another 40k from my detached garage which has business service, when you spec a system here , they send a designer out to determine your needs and send out the transformer and pole after the permit process is done.

I live in the city though, heavy residential are , so they have to do everything by thr book  

at sone point ill use all the available power we discussed that during thr interview /shrug
full member
Activity: 558
Merit: 194
I used to have a single 25 kVA pole mounted transformer feeding a 320A meter base at the house, which in turn had 2x 200A panels behind it, and a 400A meter base at my shop with a single 200A panel behind it.  The 320A meter base was feed via 350 MCM Al and the shop meter base was feed via 500 MCM Al.  350 MCM Al is rated for 280A and 500 MCM Al is rated for 350A.  This is at 90C btw, which the power company is allowed to use.

A 25 kVA transformer can only do about 105A (and peak loads up to about 140A or so @ 240V).  Around my parts most homes with 200A service have a 15 kVA transformer, and large homes have a 25 kVA transformer.  Really large residential homes have a 50 kVA transformer.  A large 50 kVA is still only able to deliver 210A or so on a 24/7 basis.  And once you get much past that, the 350 MCM Al wire running between the transformer and your meter base begins to become the limiting factor.

When I started consuming above 20,000 watts 24/7, I had the power company come out and swap my 25 kVA for a 50 kVA one.  There was no cost to me.  Where I live in rural Virginia, nothing needs to be filed or justified with the county, it is all just between me and the POCO.  I just called them up one day, and 20 minutes later an engineer was at my door step and I showed my power usage and he said yep, let's swap in a 50 kVA for you.

For residential service, POCO always size based on peak loads, so having dual 400A services from a single 25 kVA is ok, as based on their experience, they never see a residential customer coming even close to pushing the continuous rating of a 25 kVA transformer.
sr. member
Activity: 476
Merit: 278
fucking asics makers ruining everything, thank god for x16r

does raven have more exchanges?  I have a cryptobridge  I would like a few more exchanges
They are working on getting listed on bittrex(got the legal stuff about them not being a security done already) and will probably be listed soon,we cant really know the exact date because who ever subbmited request had to fill NDA also
sr. member
Activity: 1246
Merit: 274
Yeah, if I was either younger or healthy again I'd be very keen on trying to install solar myself. As it is the installations costs are pretty crazy for the couple of quotes we had. 
full member
Activity: 1148
Merit: 132
yeah phill got to the nuts and bolts of it :

If you want to mine a high residential rates u either have to have super efficient gear which does not exist atm
of offset if with solar if you plan to go big.

Btw it nakes no sense to have 700 amps of power at 240 v if you do not have the ability to draw ot least 80 percent of it from the mains.  The power company would not install meters in the usa at least knowing how much you could potentially draw withoute knowing they can supply it withoute you taking out the whole blocks power lol.

when my 400 amp panel was added there was a 3 month delay becuase the needed city aproval for a new transformer.

Solar is the future for me though. I already have an order for 300 watt panels from china. 100 panels on my home roof , i think i can fit 120 max then another 40 to 80 on the garage. 

its quite cheap if you can install it yourself.  under 10k.

the only hold up is decideing weather to go with string inverts which i hat or micro inverters which is what i want.
adding those would add another 5k or more to the inital project but makes it easier to manage the panels long term m
sr. member
Activity: 1246
Merit: 274
fucking asics makers ruining everything, thank god for x16r

does raven have more exchanges?  I have a cryptobridge  I would like a few more exchanges

I see 5

https://coinmarketcap.com/currencies/ravencoin/#markets

yeah but I can't use


 https://www.qbtc.com/   daily total trades of 3,400,000 usd  pretty sure they are in China and won't let me join

@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@
@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@

https://crypto-bridge.org/  daily total trades of 663,000 usd is the one I have

@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@
@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@

these are really small



https://tradeogre.com/ daily trade total of under 180,000 and not sure where they are based
https://nanex.co/    daily trade total of under 75,000  and not sure where they are based
https://cryptohub.online/ daily trade total of under 24,000 and not sure where they are based


I too would like to see Raven on another larger (or even medium) sized exchange.  I do know that Cryptohub is based in Argentina and I have used them (some for mining on there pool, a little for trading) for over a year and they have never robbed me.  Still it's a very low volume exchange, although they do seem to be honest in my opinion. 
legendary
Activity: 4256
Merit: 8551
'The right to privacy matters'
actually houses in my area are so big, with hot tubs electric cars requiring 50kw fast chargers etc its not hard to find a house sized with 400amps, throw in a detached garage you can easily get permit for another 300 watt for a garage shop.

Its false that they make you pay for the transformer all they need is a city permit and they put up the pole if needed.

power is not an issues.  the issue is residential rates are bad for mining.  Im my shop i have businesses rates , slowly moving my rigs there.  I pay .04 plus deman rate in the garage.  In my residence i pay 12 to 15. cents in summer no less than .11 in winter

Well, just because the main breaker says 400A doesn't mean you can actually draw 400A for more than a few seconds. Firstly, the NEC limits maximum continuous use of any circuit to 80% of the wiring or breaker rating, whatever is less (usually the breaker). Secondly, the distribution transformer (usually affectionately referred to as a "pig" if mounted on a utility pole) will likely be rated for 10kVA to 50kVA if pole-mounted, and 50kVA to 200kVA if pad-mounted, and each transformer will likely serve 1 - 6 houses so you really don't have nearly as much power available as you might think.

Our esteemed OP can probably provide a bit more detail on this seeing as he has had major electrical service work done, along with solar tie-ins, etc.

 

well  so many variables here.

and  the internet makes it hard to write precisely .

As it gets boring to read a long reply.

marvell  is saying in his area he can get 400 + 300 = 700 amps which for a home owner is a lot of power.

700 x .8 = 560 at 240 volts = 134.4   24/7/365 draw  thats a lot for a homeowner.

you can run 100 avalon 841's
or 100 6x1080ti rigs

and that is a lot for a home.

Marvell is also saying most home owners  pay quite a bit more then 4 cents a kwatt.

my garage cost is 18 cents in the summer and 10 cents in the winter.

my home was never setup to run  over 12 kwatts in the winter

and runs under 3 watts in the summer

my home is a 150 amp 220 single phase setup.

The solar array has 400 amps 240 volts
It runs buy solars house his office and the mining gear.

and it never can  go past 75 kwatts  for charging back as the power company restricted sell back to 75 kwatts per daylight hour

the array on a perfect sunny day in July  could charge back 105 kwatts so power is wasted.  this is due to transformer limits .

Buysolar paid an extra 10000 for the transformer and some power company wire upgrades.

Even though buysolar could  make his field more powerful the power company won't handle it.

Lets leave it at this:

tight margins favor:

cheap plentiful power.


So a 2 megawatt solar flield  can do 400kwatts for free  that would be 300 s9is

if you have an empty 2 megawatt field ready to go on ling  you could buy 350 s9i's

and make money for quite a while.  so anyone with cheap power in abundance is buying those s9is

buy extra for spare parts.

my example above  in nj  would be 2million to setup  and the gear would be about 220,000 more

so 2,220,000  run 300 s9s  keep the rest as parts.

in 3 years  it is still earning 10k a month

you got back 1,000,000 of the 2,220,000 million

and about 400,000 in tax credits you owe about 820,000 on a 2,220,000 investment

and remember 2,000,000 of that is solar which has a 25 year life span

this is killing the garage miner cause people with money see this a way to pay for solar.