Sometimes I wish MD101 was still around replying to my replies in the exact same fashion as crypto's number serial liar, Leroy Fodor, especially ever since he by happenstance quoted Leroy quoting Joshua Zipkin in his lame attempt to discredit my scammy ass. HAHAHA (iconic Leroy Fodor laugh in case you're not versed)
Allow me to repost the following just in case RitzBitzz comes along and quotes MD101 on the subject in RB's attempt to calm the masses re nobody is, has or will get royally fucked by HM.
And here's how badly HydroMiner is fuckin the crypto community:
September 22, 2017: https://web.archive.org/web/20170922073038/https://www.hydrominer.org/wp-content/uploads/HydroMiner.pdfToday: https://www.hydrominer.org/wp-content/uploads/HydroMiner.pdfSo that the retards are on the same page as us non-retards, the following are the facts presented by HydroMiner on their white paper:
Murau in Styria (Hydro 2): Maximum capacity of 700 kW.
Waidhofen an der Ybbs (Hydro 2): Maximum capacity of 700 kW.
Granted, my math prowess has become rusty since high school when I got a perfect 800 on the math section of the SAT (760 on the English/comprehension section), thus leaving it to others to conduct the calculations in seeing if 700 kW is morerer biggerer, morer smallerer or the samer as 700 kW (please show your work), the proof requested because ...
November 15, 2017: https://www.trendingtopics.at/hydrominer-ico-fragen-crypto-moining-h2o-token-sale/Nadine Damblon, CEO of HydroMiner, recognizes that communications around sites have been confusing. "Bruck an der Mur was an option for HydroMiner until the ICO, but there are currently only private investor investments. We then switched to the larger power plant in Waidhofen. In Murau we had an option, but it was not exercised because of too small a capacity, "explains HydroMiner.
Gulp! That explains everything. Murau was abandoned because its capacity was ONLY 700 kW, whereas the Waidhofen site has a much larger capacity, namely ... wait for it ... 700 kW.
Back to the proof I'm requesting, please include Q.E.D. at its end, for I wanna frame the work and hang it on my
balls wall.
https://web.archive.org/web/20170922073038/https://www.hydrominer.org/wp-content/uploads/HydroMiner.pdfIn this location, HydroMiner has rented one
turbine and operates with an energy price of 4.25 cents/ kW·h
https://www.trendingtopics.at/hydrominer-ico-fragen-crypto-moining-h2o-token-sale/In Murau we had an option, but it was not exercised because of too small a capacity
Prior to the ICO, the Marau site was rented, but after the ICO there was ONLY an option to rent there, abandoned due to its kW output being problematic, opting for a station with a larger, smaller or same (jury is still out) kW output.