As for concrete and pylons depends on code.
I can do this with a gravel pad and not be called permanent structure so no tax on it and no permit.
If I do concrete I need a permit.
This is different from a concrete pad. It can be either a concrete block or you can cast concrete cylinders.
this rests on the ground not permanent I could have used itthis is attached would be permanent I would need a permit and be subject to tax.I have been lucky so far with poison ivy with no incidents though my wife has had it a few times. I almost wonder if there's such a thing as immunity.
Poison Ivy is weird shit.
If I get exposed it takes 10 days to appear which is very unusual time most people will see problems in 3-5 days.
So my right arm which was digging around the roots of the stump with a small spade got it first at the wrist above the gloves. It had the most exposure and sweated in the heat.
My left arm got it next a day later much less of a problem less exposure.
My stomach got it after that because of
1) fat which slows the symptoms
2) I was wear a shirt which slowed exposure.
Finally both hips near the bone got it from resting my gloved hands on my hips over the 2 days it took to get all roots and stumps out.
What save me from really fucking up was two showers both days.
Careful handling of the clothes.
So no exposure to the private areas . @nohomo
I am not sure why I did not get any on my face but I guess I did not wipe sweat off my face with my gloved hands.
I did not know that roots 18 months old were still an issue.
So on day 10 it began by day 14 it was on both arms entire stomach and hips. The hips itched like a mofo by day 20 it was almost gone. A very little remains on both hips as I type.
Waiting for shed to arrive today.
Speaking go wood prices. I wanted to line the inside with this item
https://www.lowes.com/pd/Common-1-in-x-6-in-x-16-ft-Actual-0-5625-in-x-5-375-in-x-16-ft-Tongue-and-Groove-Spruce-Pine-Fir-Board/1000825362the inside walls are about 13ft 4 inches
I would do three or four on front long wall
I would do the whole back long wall
I would use 8 foot ones on the solid side wall.
I would spray this in the first foot of the space it makes.
https://www.lowes.com/pd/Dow-GREAT-STUFF-Pestblock-12-oz-Spray-Foam-Insulation/4778842