Pages:
Author

Topic: [www.easy2mine.com] 340$, the group buy of antminer s5(psu included) - page 26. (Read 123424 times)

legendary
Activity: 4172
Merit: 8075
'The right to privacy matters'
the fan system in data center have problem and we have to shut down all miner to protect the miner from over-heat, the engineer is already work on this issue,should be resolved soon

thank you for your attention to this.
newbie
Activity: 44
Merit: 0
All 3 of my Dragons are still down.
legendary
Activity: 1006
Merit: 1000
SafeHaven.Finance
the fan system in data center have problem and we have to shut down all miner to protect the miner from over-heat, the engineer is already work on this issue,should be resolved soon
member
Activity: 118
Merit: 10
All mine are going now but one dragon is still down
legendary
Activity: 1006
Merit: 1000
SafeHaven.Finance
you are right, will be restore within one hour

pcfli, why is this still happening?

Will our host fee be lowered due to the downtime we are experiencing?
the host fee will adjust to 110-135$ per kw from next round
hero member
Activity: 587
Merit: 500
you are right, will be restore within one hour

pcfli, why is this still happening?

Will our host fee be lowered due to the downtime we are experiencing?
legendary
Activity: 1006
Merit: 1000
SafeHaven.Finance
you are right, will be restore within one hour
member
Activity: 118
Merit: 10
I think we have just gone down again.. My miners slowly just went offline..
legendary
Activity: 4172
Merit: 8075
'The right to privacy matters'
I offered to do it at a lower price   if it was the 18th today I would be due 1010.   I am willing to do 800 usd.  I just pdf'd this page.
hero member
Activity: 587
Merit: 500
legendary
Activity: 4172
Merit: 8075
'The right to privacy matters'
legendary
Activity: 1006
Merit: 1000
SafeHaven.Finance
network problem, resolved after connecting isp
member
Activity: 97
Merit: 10
member
Activity: 97
Merit: 10
member
Activity: 118
Merit: 10
Must be another power cut right now.. all my hosted stuff is offline ..
legendary
Activity: 1456
Merit: 1000
With S3's being in stock any customer on edge might consider Bitmain's next batch that is open does not ship possibly for a little while "AntMiner S3+ for sales shipping starts on September 20th or earlier" for batch 8.

If you go with hosting online in 12 hours you can get up in 5 to 6 days before next difficulty jump.  

Just things to think about.  As always happy mining!
legendary
Activity: 1006
Merit: 1000
SafeHaven.Finance
legendary
Activity: 1006
Merit: 1000
SafeHaven.Finance
yes, we have to admit that the profit each miner can produce become less and less, which means that you have to buy a lot of miner to get some profit, the good thing is the price of the miner also become cheap, so you can buy many unit of miner with the same money, but that will lead to too much power usage, it is impossible to host so many miner in home if you want to buy more than 50 unit s3, so host is still the good way, meanwhile on my side, seems i need to adjust the host fee in future to let customs make profit on long run,  the good thing is if the amount of money each miner can make not very much, the reliability of the power supply is not very serious, since i can just deduce the host fee of lost time.
BTW, we will draw a back up power supply within 2 weeks, however, we canot provide UPS to make no power cut time, which means  although we can not promise no power off time, but we can promise that there will be no long time power off time, if the power off longer than 1 hour, we will switch to back up power supply
legendary
Activity: 1456
Merit: 1000
0.66 btc is about 386$ , and psu is about 40$, set up fee 15$, so that is about 441$, and if i sold my running one to you today, even i place a new order at 0.66btc, the bitmain can only ship the new one out on Aug 12 and arrive in my DC on Aug 14, so i will lose about 5 days earning, which value 0.01*5=0.05 btc or 29$, so the total price is about 470$
and i only have 9$ profit, if they delay for one day, i will no profit at all.

anyway, it is not the meaning of my question, can you give the profit of 180 day?

yes here is  585 usd a coin 8% jumps  at 170 days to 190  a 2% pool fee.   no cost for the gear no cost for power

and same with 10% jumps.

  now you are charging 479 + 135 = 614 for 90 days and 479 + 270 = 749 for 180 days.    so it is really tight as to if it makes money.

 if rates of diff stay flat at low btc rate of 585 your deal will be just a bit off.
(saving space look above for pictures + rest didn't want to flood thread)

We will have to see what happens on difficulty the last 3 have been 5%, 8%, 3%.   I can't predict jumps in difficulty but i think we are looking at <10 at current equipment out there.  Difficulty is trending in a good way for us miners lately in bitcoin mining, this is personal opinion.  I know some experts who estimate huge network increase, and others who don't only time will show.  But as of last 3 changes we have not hit 10 and look promosing.

Also the S3 will have a value for foreseeable future.  You will see S1's have customers still for undervolting for example.  I think at the end you can count on someone wanting to buy.  No one can predict that price though on that.
legendary
Activity: 4172
Merit: 8075
'The right to privacy matters'
0.66 btc is about 386$ , and psu is about 40$, set up fee 15$, so that is about 441$, and if i sold my running one to you today, even i place a new order at 0.66btc, the bitmain can only ship the new one out on Aug 12 and arrive in my DC on Aug 14, so i will lose about 5 days earning, which value 0.01*5=0.05 btc or 29$, so the total price is about 470$
and i only have 9$ profit, if they delay for one day, i will no profit at all.

anyway, it is not the meaning of my question, can you give the profit of 180 day?

yes here is  585 usd a coin 8% jumps  at 170 days to 190  a 2% pool fee.   no cost for the gear no cost for power

and same with 10% jumps.

  now you are charging 479 + 135 = 614 for 90 days and 479 + 270 = 749 for 180 days.    so it is really tight as to if it makes money.

 if rates of diff stay flat at low btc rate of 585 your deal will be just a bit off.

margins are getting very tight for all of us.



if you charge 749 for the miner and 180 days of power a 8% diff  is 749 - 739 a 10 dollar loss.






if you charge   749 for the miner and 180 days of power  a 10% diff will lose a little more then 749- 669 = 80 dollars

Pages:
Jump to: