Pages:
Author

Topic: [ANN] [ICO] Wind Energy Mining. Green Energy – Green Mining - page 7. (Read 16005 times)

newbie
Activity: 164
Merit: 0
reserve Russian translation
sr. member
Activity: 1988
Merit: 275
So I can't see your team right now? At least tell me, is Your project based on a real relationship or is virtual Dating?
Quite real. As we mentioned, the members of the team are our company's employees and involved persons. Information about the company and description of the team are at www.etb.lv. Whitepaper contains both short description and photos of the team. You can also find us on Google Maps. Anyway, thank you for the reply, we'll fix this shortcoming and update the article.
https://etb.lv/pdf/Whitepaper_Wind_Energy_Mining_(en).pdf

Maybe you can post the team members also on your website and not only in your whitepaper. So it's easy to check their profiles. People here are sometimes lazy to read whitepaper. And please add their profile links also. And from what I understood, you will build the mining farm in Latvia also, but do you have the legal permits already for that?
copper member
Activity: 110
Merit: 0
So I can't see your team right now? At least tell me, is Your project based on a real relationship or is virtual Dating?
Quite real. As we mentioned, the members of the team are our company's employees and involved persons. Information about the company and description of the team are at www.etb.lv. Whitepaper contains both short description and photos of the team. You can also find us on Google Maps. Anyway, thank you for the reply, we'll fix this shortcoming and update the article.
https://etb.lv/pdf/Whitepaper_Wind_Energy_Mining_(en).pdf
copper member
Activity: 110
Merit: 0
As far as the information mentioned in this article is concerned, I am looking forward to updating the whitepaper, dev team, ...etc

You can find this information on our site www.etb.lv


member
Activity: 266
Merit: 10
As far as the information mentioned in this article is concerned, I am looking forward to updating the whitepaper, dev team, ...etc
member
Activity: 280
Merit: 10
Please tell us who the dev team is, it's a necessity
full member
Activity: 490
Merit: 103
So I can't see your team right now? At least tell me, is Your project based on a real relationship or is virtual Dating?
copper member
Activity: 110
Merit: 0
[ANN] [ICO] Wind Energy Mining. Green Energy – Green Mining. Token sale start on March 20, 2018

PROJECT UPDATE PAGE 6

How often do we think what we and our children breath in? Do we think what electricity is made of when we turn on the kettle in the morning, or why it snows where it shouldn’t be any snow? Crypto currency mining consumes a huge amount of electricity, at production of which mainly fossil sources – gas, coal -  are used. This particular issue has become one of the reasons for restrictions imposed on the mining of crypto-currency. The only way to solve this problem is to develop and increase the production of alternative energy

Unfortunately, the green electricity producers often face reluctance of bureaucratic entities and political elites, closely related to oil and gas monopolies, to support such production. Moreover, producers face deliberate intention to impede their development. The possibilities of the producers are limited by the bodies regulating energy sector, new unreasonable requirements are introduced, and the production becomes impossible in principle. In such circumstances, the payback problem is thrown into sharp relief. The possibility to build new green power stations is doubtful, because the political and bureaucratic obstacles connected with oil and gas sector lobbying, limit the freedom of actions of the industry willing to develop green energy production.

The Wind Energy Mining project aims to circumvent these obstacles.

Our company has been dealing with wind electric energy production in Latvia for more than 10 years
The company owns 7 wind-driven electric power stations with total capacity of 4.5 MW. The geographical location of our wind power stations lets produce electricity throughout the year.
We are going to use our electric energy for mining for cryptocurrencies and to allocate the proceeds from mining to the development of production and new power stations construction.

 ICO OBJECTIVE AND DETAILS
ICO objective is fundraising for the further development of wind energy production, through an Ethereum based token issue.
WEM tokens are debt tokens
WEM price – 0.001 ETH
Accepted currency – Ethereum
Buyback price – 0.0015 ETH


Whitepaper
https://etb.lv/pdf/Whitepaper_Wind_Energy_Mining_(en).pdf

ICO launch: March 20, 2018

Buyback start: in 9 months after the ICO and fund raising
Buyback period: 2 years
Detailed information on our token, possibilities of buying, and buyback you can find on our homepage www.etb.lv

PROJECT DESCRIPTION
Purchase of mining equipment
Increasing the capacity of the wind park and its supplement by solar power stations
Use of renewable electric energy for cryptocurrency mining
Cryptocurrency selling – return of investments and further development of the project

ALLOCATION OF TOKENS
90% - ICO participants
 5% - the team
 5% - bonus program

ALLOCATION OF ICO FUNDS
28% - purchase of 1,000 ASIC Innosilicon A6 LTC or 2,000 Antminer L3+ and 1,000 Antminer S9
12% - purchase of GPU equipment (6,000 GPU Radeon VEGA 64)
15% - construction of solar power stations with total installed capacity of 2 MW
15% - project implementation costs (construction, electric installation)
30% - modernization and increasing the capacity of the wind park

RELIABILITY OF INVESTMENTS

* Existing wind park – guaranteed electric energy for mining
* Long-term operational experience
* Transparency of the project – all information is available on our website
If the planned amount is not raised (or bigger amount is raised), the project costs will be reduced or increased proportionally according to the amount of raised funds. The project will be started within the available amount.

PROJECT ROADMAP

1Q 2018 – Preparation for the ICO, the ICO launch, fund raising
Up to the end of 2018 - Procurement and installation of mining equipment, and wind generator park supplement by solar power stations
2019 - Mining. Token buyback
2020 - Mining. Token buyback. Renewable resource park modernization and capacity increasing

Partners:
www.belovitlab.ru
www.smartcontract.ru


Connect us:
We are on  
Facebook
Telegram
Twitter


links on www.etb.lv
Pages:
Jump to: