The minion has passed the DRC checks. Mask manufacturing has begun. (This was as of last night)
For us laymen, does that mean they are on, ahead, or behind schedule?
Sounds like they're at least on schedule. From wiki:
Design Rule Checking or Check(s) (DRC) is the area of Electronic Design Automation that determines whether the physical layout of a particular chip layout satisfies a series of recommended parameters called Design Rules. Design rule checking is a major step during Physical verification signoff on the design, which also involves LVS (Layout versus schematic) Check, XOR Checks, ERC (Electrical Rule Check) and Antenna Checks. For advanced processes some fabs also insist upon the use of more restricted rules to improve yield.
Thanks for posting that... I had to look it up myself.