Dear customer,
What is the expected time required for the manufacture from your
source?
-originally 10 days to be able to ship the first week orders,
through the delay we must wait, we are not the only ones
who let produce in this factory. More informations will
be published next week.
how are you going to go about mass producing?
-see above
how is the optimization coming along? can you give details of what
needs or needed to be optimized?
-we need more coreclock -> more voltage, not possible through
the resulting higher temperatures.
Currently we are working on a watercooling system.
The final product will need more then 200 watt,
we try to hold the consumption on around
240 watts or we need to redesign the pcb,
our current design allows only around 250 watts.
With best regards,
Your CedarTec Team.
bitcoinarama, they only plan to produce 100/week. the information they provided in the email does make sense, their pcb atx 20pin connector can only supply a maximum of 251watts.
Highlighted sounds kind of familiar