Pages:
Author

Topic: ⚡⛏️[ANN] Giga Watt: Best Home for your Mining. Starts today! - page 10. (Read 203347 times)

full member
Activity: 552
Merit: 110

Total kWT = total Kilowatt consumption of miners without tokens

Free kWT = Kilowatt consumption not covered by tokens

WTT set to tariff = amount of WTT tokens thrown at the tariff

If WTT set to tariff > total kWT, then free kWT = zero


How would you use the above data to figure out which rate to allocate your tokens to?

Thanks
full member
Activity: 644
Merit: 103
Pangborn Development Site VI

Work continues building out the Giga Watt facilities at Pangborn MAY 23



With the help of Greenleaf we have got all of the trenches dug and Nepel Electric has laid the conduit to both the PUD’s side and our side for the transformers. The ground grid should begin to be laid tomorrow, then resistance will be measured and once that is checked off, the backfilling of special gravel chips will be laid. L&I has rescheduled our meeting for Thursday 5/24 at the Giga Watt facilities and both the PUD and the Port will be in attendances so that all agencies can sign off on final approvals as to who will manage the substation. Our crews that are to complete the H-Frame are scheduled for Friday this week. Power is turned off and they can get in to the site with equipment, lifts, cranes and steel workers.
https://medium.com/gigawatt/pangborn-development-site-vi-5ae4ad500cd4

jr. member
Activity: 62
Merit: 5
Is gigawatt still around?

Nope, only cuteman... Gigawatt's propaganda machine Grin
Haha
Looks like it too. I sent two email on support. I'm on telegram & getting ignore like they can't read my messages. I mean are we fuck or what?

I haven't checked in for a while since I don't think anything is really happening and Giga Watt continues the "it the governments fault" campaign.  Every time they say it is just two weeks away. There was a comment from someone who drove by their site and said the pods aren't even half done and no one is even working on it. These guys are a joke.
jr. member
Activity: 62
Merit: 5
So you are saying just a few more weeks for Pangborn to be done?!!!

When is this actually going to be ready for miners???
full member
Activity: 392
Merit: 102
With all the developments, I still cannot believe that all my WTT tokens for rent aren't used.... ?
What's happening ? WTT to rent should be in demand no ?!
Giga watt promises that 100% of the wtt tokens will be rented after they finish current facilility at Pangborn, which may take a few more weeks.  But who knows, maybe some new obstacles suddenly appear...
legendary
Activity: 1364
Merit: 1000
With all the developments, I still cannot believe that all my WTT tokens for rent aren't used.... ?
What's happening ? WTT to rent should be in demand no ?!
full member
Activity: 392
Merit: 102
In this meeting L&I expressed that they needed more time to create the regulations as they have not let a private company ever run and operate a substation over 600 Volts in the state of Washington.  The PUD said that they possibly would be willing to operate the substation as long as L&I would approve and sign off on it.
[/quotenly
One can see that officials are constantly raising huge number of obstacles for the mining.  Delays are mostly dut to these "regulations"...

p.s. L&I is the Washington State Department of Labor & Industries
full member
Activity: 392
Merit: 102
Pangborn Update 18 May 2018

On Tuesday we got half of the H-Frame up, however there needs to be steel workers on site to cut and weld a few more of the cross members together.  The PUD has scheduled maintenance on our line so that we can do the necessary work to bring power to the site between May 25th-30th.  We have scheduled the cranes, steel workers and man lifts to do this work for that time.  We had Green Leaf excavation in on Wednesday and Thursday digging and completing the trenches and layed the conduit for both the PUD’s Transformers as well as ours.  The ground grid got delayed by Nepel electric due to heavy rain, this should be completed next week.  Sigmasix was also working with Nepel electric this week testing each pod and the switchgear to determine that everything was in compliance and all connections were correct.  Today we met with the PUD’s Sr Field Engineer and L&I to check our last few items off of our list.  In this meeting L&I expressed that they needed more time to create the regulations as they have not let a private company ever run and operate a substation over 600 Volts in the state of Washington.  The PUD said that they possibly would be willing to operate the substation as long as L&I would approve and sign off on it.  We will be meeting with L&I officials next Wednesday at 9:00am to determine this outcome for both the mobile and the permanent substation.
full member
Activity: 204
Merit: 101
In the little "Rent Out Tokens" window that opens us for us as we seek to find the best rate, we are presented with the rates we can get for renting out our tokens on the left side of that little viewing window. But next to the column on the left is another column that says "Total kWT" ... What does that mean? And next to this one the column says " Free kWT" and  what does that mean? The next one on the very right says: "WTT set to tariff".  What does  that mean?  Can you briefly explain what these column headings are telling the people who want to rent out their tokens to others?

Do not give me the article from Medium as that is the old one and does not apply to the new lay out.

Thank you

Total kWT = total Kilowatt consumption of miners without tokens
Free kWT = Kilowatt consumption not covered by tokens
WTT set to tariff = amount of WTT tokens thrown at the tariff

If WTT set to tariff > total kWT, then free kWT = zero
full member
Activity: 552
Merit: 110
In the little "Rent Out Tokens" window that opens us for us as we seek to find the best rate, we are presented with the rates we can get for renting out our tokens on the left side of that little viewing window. But next to the column on the left is another column that says "Total kWT" ... What does that mean? And next to this one the column says " Free kWT" and  what does that mean? The next one on the very right says: "WTT set to tariff".  What does  that mean?  Can you briefly explain what these column headings are telling the people who want to rent out their tokens to others?

Do not give me the article from Medium as that is the old one and does not apply to the new lay out.

Thank you
full member
Activity: 392
Merit: 102
I can't find WTT on coinmarket now. What's their contract address?
Do you mean address of the issuer of  Giga-watt tokens?   Check this one:  0x84119cb33e8f590d75c2d6ea4e6b0741a7494eda
legendary
Activity: 2632
Merit: 1094
I can't find WTT on coinmarket now. What's their contract address?
legendary
Activity: 892
Merit: 1002
1 BTC =1 BTC
Any news for customers still waiting to get their rigs deployed or is Gigawatt only building POD's to deploy their own rigs ?
They promise to finish buildings in 2 weeks, and after this it could take a few weeks for deploymet.  So it could be in June only  Undecided

By that time ROI will be completely destroyed... their goal achieved, well done Giga-scam
full member
Activity: 392
Merit: 102
Any news for customers still waiting to get their rigs deployed or is Gigawatt only building POD's to deploy their own rigs ?
They promise to finish buildings in 2 weeks, and after this it could take a few weeks for deploymet.  So it could be in June only  Undecided
legendary
Activity: 892
Merit: 1002
1 BTC =1 BTC
Any news for customers still waiting to get their rigs deployed or is Gigawatt only building POD's to deploy their own rigs ?
full member
Activity: 552
Merit: 110
What exchange are these tokens listed on?
Yobit and Forkdelta.  These are the only exchanges at the moment. Listing on exchange takes a lot of money for the issuer, and this task is not of a priority for the team now.


After a while these tokens will strengthen in price because they have a strong use case. As long as the total project is successful the tokens will appreciate also.
full member
Activity: 392
Merit: 102
New update follows:

Pangborn Update May 14/2018 - We have met with the PUD and they will be shutting down the hotline temporarily tomorrow morning so that our crews begin their work.  The crane operators as well as the electricians will be onsite to begin the installation of the H-Frame.  The weather looks good and the wind should be at a low enough speed that it should not create any further delays.  The drilling company has finished topping off the wells and they are now sealed and will be awaiting the ground grid to be laid this week.

full member
Activity: 392
Merit: 102
Great.  From the article we can see how much work, and moreover how many stages of approvals from officials have to be completed. Unfortunately all these are causing delays.
full member
Activity: 392
Merit: 102
What exchange are these tokens listed on?
Yobit and Forkdelta.  These are the only exchanges at the moment. Listing on exchange takes a lot of money for the issuer, and this task is not of a priority for the team now.
Pages: